Laserfiche WebLink
. � ��A,I� �E�'fE1�11 �I�ECKL�ST �Ol� �E�V �TRfJCTURES / ��QiTIO�ES <br /> . � <br /> y � <br /> �` Address: ���� s°.-���''"�, CJ� Permit No.:�d��`���.�� <br /> Description of�vork: Date Rec'd: <br /> Septic review by: Date Approved: <br /> Zoning review by: ,� Date Approved:� <br /> ,, p . <br /> Building review by: �� ��� Date Approved: � �' <br /> Grading review by: Date Approved: <br /> �` Zonfng District: Zoning File#: Re��#: Reso Date: <br /> �oning: Lot Area: SF/AC �Vlidth: Lot Coverage: SF % <br /> � Sunrey Submitted: ❑ Yes � No Date of Survey: Revised date(?): <br /> �� � <br /> �`' Landscape plan submitteci? 0 Y�s Q No Landscaper: <br /> � . <br /> Proposed Setbacks: <br /> � <br /> Front(Lake) Rear(�treet) ( -,,N S E W ) ( N S E ,%lllf ) Other�uildings Wetland <br /> Side Side <br /> Defined Height: Peak Fteeght: FFE: FFE minus 6 feet= (Existing Contour) <br /> ��.`. Perimeter(linear feet} Y 50% = L.F. below gracie <br /> °�. <br /> � Basement? 0 Yes ❑ No, Stories <br /> .� <br /> ,: <br /> FOR A BUILQII�G WITH A BASEMENT OR CRAWL SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the lowest propos,d Slab at or above grade— <br /> floor(of the basement or crawl space)anc� measure from hiQhest existinq <br /> � START WITH � <br /> the highest point of the roof. � START WITH �9 ade to the highest point of the <br /> � roof even if fill was brought in to <br /> �t elevate home. <br /> If you have a... � <br /> SUBTR,4CTION • GABLE OR HIPPED ROOF(no �� Slab below grade—measure <br /> �: (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof <br /> � hi hest oint of the roof. <br /> to the low point of the correspo�ding If you have a... <br /> gable or hipped roof SUBTRACTION ' GABLE OR HIPPED ROOF <br /> GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> � the distance between the <br /> windows): Subtract hatf the distance ROOF TYPE) <br /> highest point of the roof to <br /> between the top of the highest the low point of the <br /> ' window and the highest point of the corresponding gable or <br /> roof hipped roof <br /> �• • ALL OTHER ROOF TYPES(flat, < GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. (with windows): Subtract <br /> SUBTRACTION Subtract the distance between the half the distance between <br /> (BASED ON basemenUcrawl space floor and the the top of the highest <br /> EXISTING highest existing grade adjacent to the window and the highest <br /> GRADES) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> �;_ (flat,mansard,etc):No <br /> EQUALS Deflined builcling height subtraction. <br /> Oefined building height <br /> EQUAL3 <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-20'k5.docx <br />