Laserfiche WebLink
MECHANICAL SYSTEMS BEING INSTALLED <br /> Note: All Geothermal Systems will now require a Site Plan & Review by our Building Official. <br /> [S THIS GEOTHERMAL? ❑ Yes ❑ No <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H.Power <br /> FIREPLACES <br /> �J" Gas Factory Fireplace Brand Name: �—�U�� <br /> ❑ Wood Burning Fireplace <br /> ❑ Wood Stove Model No.: �,p��2 1��`-L.6 <br /> ❑ Wood Stove with Flue/Masonry --' <br /> VENTILATION <br /> ❑ No. Kitchen Exhaust duct recirculating cfm <br /> ❑ No. Bath Exhaust(must have duct outside) cfin <br /> ❑ No. Other Fans: Locations cfm <br /> FUEL STORAGE (Must be npnroved by Fire Marshall if proposing to abnndon tnnk in place.) <br /> ❑ Installation ❑ Removal <br /> Fuel Oil: gallons ❑ Underground ❑ Inside ❑ Outside <br /> LP Gas: gallons <br /> Other: <br /> GAS LINE ONLY <br /> ❑ Outdoor Grill ❑ Other/List What&Where: <br /> 2 <br />