My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2526
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 2500 - 2599 September 12, 1988 - March 13, 1989)
>
Resolution 2526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 2:14:34 PM
Creation date
6/29/2016 2:14:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2526 <br />1. Prior to the hauling of fill to the site, the applicant or <br />applicant's agent must submit the following; <br />A) Six cross sections of existing topography. <br />B) Final grading and erosion plan designating the following: <br />i. Side slopes 5:1 ratio; <br />ii. 1% slope to be maintained within inner fill area; <br />iii. Silt fence installed 30-35' from wetland at 972 <br />elevation - no land alterations allowed within 26' of <br />wetland; <br />C) Executed developer's agreement and appropriate security to <br />• ensure final grading and seeding if fill project is not <br />completed. <br />2. Fill shall not exceed allowed amount of 100,000 cubic yards. <br />Average height of fill to be maintained at 51. Side slopes to be <br />graded and seeded periodically during the course of the project. The <br />Orono staff is to advise. applicant or applicant's agent when seeding <br />is to be conducted. <br />3. Park Construction shall be responsible for advising the City of <br />the monthly schedule of hauling activities so that staff can arrange <br />an inspection schedule for the month. Prior to hauling any fill to <br />the site, Park Construction must arrange for a pre -construction <br />meeting with the Orono staff to review all final submittals and <br />tentative hauling schedule. The City will ask that a representative <br />of its Police Department be present at the pre -construction meeting to <br />advise of any special traffic/safety concerns during the hauling <br />process. <br />4. Hauling activities shall not be conducted during the following <br />time periods: <br />6:30 a.m. to 8:30 a.m. <br />4:00 p.m. to 6:00 p.m. <br />U <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.