My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
01-18-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2012 12:05:50 PM
Creation date
3/14/2012 12:05:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' � EXHIBIT D <br /> � <br /> I� <br /> TO: Janice Gundlach <br /> FROM: Matt Bolterinan, On-Site Systems Manager <br /> DATE: January 11, 2005 <br /> SUBJECT: Septic Review for 1745 Fox St. subdivision <br /> This property is Ueing proposed to be split into 6 lots. One of the lots will have the existing <br /> house(s) on it and the other lots are vacant. All the lots show 2 five bedroom septic sites. All <br /> sites ineet the setback requirements of 75 feet to type 3-7 wetlands and 26 feet to type 1-2 <br /> wetlands. They also all meet the 20 setback to roads and property luies. <br /> Lot 2 does not meet the 20' setback froin septic site to house pad. Lot 2 inust show that there is <br /> enough rooin to fit in liouse tliat meets all setbacks. The sites also look like they maybe a little <br /> small for both septic sites. The design should show if the sites are large enough. <br /> Conclusion: <br /> No soil borings have been t��rned in. This approval is for locations only. Septic designs must be <br /> turned in that verify that the site locations will work in the drawn locations. <br /> 1) I reconunend approval on lots 1-3-4-5. <br /> 2) I recommend approval on lot 6 if the guest house is torn down or if they show septic designs <br /> that account for flow from both houses. <br /> 3) I recommend approval on lot 2 if it is shown that house pad can ineet 20 setback to septic <br /> sites aild if tlle design shows that the mound sites are large enough. A design must be done <br /> for both primary and secondary site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.