Laserfiche WebLink
Jan 12 2005 8: 3E B�NESTR�O ROSENE RNDERLIK fi516361311 p. 3 <br /> 2335 West Highway 3G • St. Paul, MN 55113 � <br /> �Bonestroo <br /> Rosene Office:651-636-4G00 • Fax:G51-63G-1311 �°°"°` <br /> ��Anderlik& www.bonestroo.com <br /> Associates <br /> Engineers&Architects <br /> January 11, 2005 <br /> Mr.Mike Gaffron <br /> Planning Director <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: Stonebay Lofts <br /> File No. 139-OS-000 <br /> Plat No. OS-3081 <br /> Dear Mike: <br /> � We have reviewed the revised plans for the proposed Stonebay Lofts Development. The site is located along <br /> the westerly side of the Stonebay subdivision north of Kelley Parkway and adjacent to the City's Public Works <br /> Building. We have the following comments with regards to engineei7ng matters: <br /> • Sheet C3.1 shows proposed reta.ining wall construction at the underground parking entrance. This wall <br /> shown exceeds 8-feet in height. All retaining walls that exceed 4-feet in height require a separate <br /> engineered design and detail submittal for review and approval. <br /> • The revised plans show only one access to the underground parking,wh ereas the previous submittal had <br /> two. We would recornmend that a second access to the underground parki.ng be added. <br /> • Stop signs should be added for outbound traffic from the underground parking. <br /> • The plans should include a pedestrian crossing sign at the crossing shown near the middle of the outdoor <br /> parking area. <br /> • The applicant should provide the City with the project SWPPP for the Phase II Construction Site Peirnit <br /> and a copy of the Notice of Coverage Cert�cate prior to starting work on site. <br /> • The grading plan should include erosion and sed'unent control details and notes. Items such as fiber <br /> blanket installation and location, inlet protection, stockpile locations, silt fence maintenance <br /> requirements, construction entrances, and any other issues relating to erosion and sedi.ment control <br /> should be clearly shown on the final plans. <br /> • The final plans should identify the name and phone number for engineering contact person regarding <br /> erosion and sed'vnent control issues. <br /> � The 3-foot wide sidewalk on the west side of the building is a drainage way. <br /> ' • The applicant should provide calculations justifying that the 6-iuch sanitary and water services are <br /> adequate for the proposed building. - <br /> + Final plans should include provisions for managing sump pump and roof drain water. <br /> • Parking lot and new roadways are to have 8618 curb and gutter <br /> • Plans should be submitted to the fire marshal for review of fire hydrant coverage and fire vehicle access <br /> to the site, <br /> • If patios instead of balconies are installed on the ground level, the grading plan should be revised to <br /> eluninate Yhe steeper slopes currently shown along the north side of the building. <br /> ■ St. Paul, St. Cfoud, Rochester, Wilimar, MN • Miiwaukee, WI ■ Chlcago, IL <br /> Afflrmative Actlon/Equal Opportun�ty Employer and Employee Owned <br /> . . .. . . . . . , . . � . . . � , � . . . . . � ' . i. . .. . _ . , . . . � • . . <br />