My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
01-18-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2012 12:05:50 PM
Creation date
3/14/2012 12:05:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� � <br /> ����\ � <br /> �� <br /> LAI�TDFORM <br /> h11NNEAPOLIS•PHDENI% <br /> January 10, 2005 <br /> Michael Gaffron <br /> City of Orono <br /> 2750 Kelley Parkway <br /> PO Box 66 <br /> Crystal Bay, MN 55323 <br /> RE: StoneBay Condominiurn Pian Amendment <br /> Dear Mr. Gaffron, <br /> On behalf of our client, ZB Companies, Landform is pfeased to submit this application <br /> for RPUD generai plan amendment and final pfat for Outlot E, StoneBay, located north <br /> of Ke(ley Parkway on the western portion of the StoneBay development. <br /> We are requesting approval of an RPUD general plan amendment for minor changes to <br /> the condominium building. As we have moved through the design process we have <br /> identified severai improvements to this condominium building that we would like to <br /> incorporate into the pian. <br /> 8uildinq Desiqn <br /> The StoneBay condominium project still includes 62 uniks as originally approved. While <br /> the original concept included two buiidings joined by a common underground parking <br /> area, this concept includes the same shared underground parking, but links�the two <br /> buildings above ground to provide (arger living spaces and additional amenities as the <br /> local housing market dictates. The revised plan also has elimina#ed the front garage <br /> access which cleans up and simplifies the front elevation. <br /> The central core area was added to create a single building and provide many new <br /> facilities for community use by the residents. This core area includes amenities such as <br /> a Guest unit, a large Community room, an exercise room, hot tub area, and the parking <br /> level includes individua! tenant storage cubicles. These added amenities allow for an <br /> improved quality of life, which is essential in today's competitive rnarket and will help <br /> the developer continue StoneBay's commitment to quality in the Orono community. <br /> The central core has been limited to 2 stories at the front of the building to minimize the � <br /> visual mass. As previously shown, the western end of the building is also limited fio 2 <br /> stories to minimize mass. <br /> Another essential interior building amenity is to provide 9'-0" ceiling heights on all 3 <br /> floors to address market demand and current construction standards for this type of <br /> 650 BU7LER NORTH BUILDING 510 FIRST AVENUE NORTH MINNEAPOLIS,MN 55403 � <br /> OFPICE:612.252.9070 FAX:612.252.9077 ww�v.landform.net : <br /> '�TITI`7'IT. f'fi':=7^t'►r1'�7^17'T'7-TI"I"1'- • <br />
The URL can be used to link to this page
Your browser does not support the video tag.