Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> MONDAY, MAY 17, 2004 <br /> 6:00 o'clock p.m. <br /> (5. #04-2974 RELIANCE DEVELOPMENT COMPANY,LLP,Continued) <br /> C. Required Parking. Gaffron pointed out that in accordance with past Planning <br /> Commission discussions,the proposed 150-stall number exceeds by one stall the <br /> requirements established for the site in terms of accepting Walgreens 60-stall need and the <br /> remaining retail at the City requirement of 1 stall per 150 s.f. of net retail space. Even if a <br /> stall is lost to provide the suggested pedestrian connection from Walgreens to the <br /> Willow/12 corner,the parking needs will be met. Staff recommends approval of the <br /> parking plan as designed. <br /> D. Lot Coverage. Gaffron referred to numerous prior Planning Commission discussions <br /> regarding where there is a substandard lot created and applying the 15%lot coverage <br /> requirement as required by Code Section 78-1403 which limits lots of 0-1.99 acres in area <br /> to 15% lot coverage by structures. The subdivision of the subject property results in the <br /> following: <br /> - Lot 1 (86,268 s.f. or 1.98 acres)is proposed with buildings totaling 13,930 s.f. or 16.1% <br /> coverage. <br /> - Lot 2(74,428 s.f.) is proposed with buildings totaling 14,820 s.f. or 19.9% coverage. <br /> -Overall coverage of the 3.69-acre site is proposed at 17.9%,not including freestanding trash <br /> enclosures. <br /> Gaffron supplied information on the small number of developing or redeveloping commercial sites in Orono <br /> that were subject to the 15% lot coverage requirement. These include: <br /> Service 800 on Hwy 12 (0.96 acres, 26.1%lot coverage) -pre-existing site <br /> Culver's in Navarre(1.52 acres,20.2%lot coverage) -pre-existing site <br /> Snyder's in Navarre(1.9 acres, 14%lot coverage) -pre-existing site <br /> Wagner Rental in Navarre(1.2 acres, 12 %lot coverage) -pre-existing site <br /> The dental office on Kelley Parkway was a pre-existing 2.0-acre lot and not subject to the lot coverage limit. It <br /> has about 18%lot coverage. <br /> Gaffron stated that from staff's perspective the overage above the 15%is not an issue here and appears to be <br /> reasonable given the limited amount of site. He recognized the Community Management Plan references <br /> holding to the 15% limit but saw few potential problems as the City has so few sites zoned for commercial <br /> uses that he recommended maximizing rather than underutilizing the site. He spoke of a `balancing act' and <br /> needing to have balance when applying requirements with the Community Management Plan's goals and <br /> policies. <br /> E. Green Space. Under the current proposal with the elimination of`proof-of-parking', <br /> green space on the site will be 26%,which meets the 25%goal. <br /> F. Loading Berths and Trash Enclosures. Location and details for loading berths and trash <br /> handling facilities, including cross-sectional views,were provided and shown on the <br /> plans. <br /> G. Sipnape. The two primary monument signs are proposed at a dimension of 10'high and <br /> 14'-8" wide, exceeding the 10'width recently adopted for monument signs (See Exhibit N, <br /> Ordinance No. 6,Third Series), including the pillars. <br /> The building wall signage appears to be consistent with what would be expected for a <br /> Walgreens and a small retail center and meets code standards. The Stonebay Monument at <br /> the corner of 12/Willow is acceptable to staff as designed. <br /> Page 7 of 40 <br />