Laserfiche WebLink
\ <br /> � <br /> ,���. <br /> ;;.� .,� <br /> � ����. <br /> %� 4\���;� <br /> �� -, �� ���r� o� o�o��► <br /> � � � - <br /> r a� I <br /> � � = � MunicipalOffices <br /> � � <br /> ;�"�` � ,i , `. 'ti;;; <br /> ���.'� ,�i"" ' , `�'���`� �.�% Street Address: Mailing Address: <br /> ' ��R ' � ���� 2750 Kelley Parkway P.O. Box 66 <br /> ., �. kE3K� i;; <br /> '���� Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: Tl�e Current Owner of Address <br /> � 3�� ��,�r,- �i <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City HaII. <br /> Imminent Public Health Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou�ht into compliance <br /> within 90 days. Failure to do so will result in refenal to the City Attorney for <br /> legal action. <br /> System Identif as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 � <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s�mp out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift taril:be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> ��:a . The tanl:(s) should be cleaned throuQh the manhole and <br /> not throuQh the inspection pipes, tlus allows for proper cleanin�. <br /> Comments: <br /> � ��y /�j� /�( � <br /> �� � r 4� N��� � E �Y -1..�' �✓ . <br /> Inspecto:: ` Date of Inspection <br /> Telephone 19�2) 249-�600 • Fat (9�2)249-461h <br />