My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/15/2004 Planning Commission Minutes
Orono
>
Planning Commission
>
2004
>
03/15/2004 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 10:30:44 AM
Creation date
3/9/2012 10:30:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday, March 15, 2004 <br /> 6:00 o'clock p.m. <br /> (#14. #04-2997 CITY OF ORONO, BIG ISLAND CONDITIONAL USE PERMIT, <br /> VARIANCES—Continued) <br /> formerly used on the north side of the wetland. That access was on private property, and the <br /> owner recently converted it to lawn area. The City has long held that the City has an obligation <br /> to provide reasonable access to the interior roads on the island for the occasional service vehicle, <br /> and for the needs of the few inland properties that do not abut the lakeshore. <br /> The driveway will constitute filling of 25 cubic yards of gravel in the 0-75' zone, requiring a <br /> CUP, and will constitute approximately 750 s.f. or 12% impervious surface in the o-75'zone. <br /> These impacts are unavoidable in order to provide suitable access, and have been minimized by <br /> limiting the width of the driveway to 10'. <br /> With passage of the WCA, the Minnehaha Creek Watershed District was designated by the City <br /> as the responsible Local Government Unit (LGU) for administering the WCA regulations. These <br /> regulations provide degrees of flexibility for certain types of wetland alteration activities, which <br /> are seen as positive rather than detrimental, and they provide for mitigation of negative impacts <br /> when they are unavoidable. <br /> The appropriate applications are being made to the MCWD. MCWD approval shall be required <br /> before the project may commence. <br /> Gaffron noted that this application was prepared by Public Services Director Greg Gappa with <br /> the assistance of John Smyth, Water Resource Specialist with Bonestroo & Associates, the City's <br /> engineering and environmental consultants. <br /> Because wetland alterations are not allowed by Orono Code except by variance, the activity is <br /> required to be justified via the demonstration of a hardship. The commission was asked to review <br /> the hardship statements within the application packet. The need for access to inland properties is <br /> a valid hardship that supports this variance request. The locations of the few access points to the <br /> island were platted a century ago,before motorized vehicles were common. The access points <br /> generally were platted at low points in the topography, for obvious reasons. This is one of the <br /> only potential access points for the north half of the island, and the proposed work is necessary <br /> from a public a safety standpoint, as well as to provide access to inland lot owners. Access <br /> cannot be provided without work in the 0-75' zone. <br /> Gaffron stated that staff recommends approval of the variances and CUP to allow the wetland <br /> alteration and driveway construction project, including filling of a portion of the wetland, <br /> excavation within 26' of the wetland, and filling and hardcover within the 0-75' setback zone per <br /> the revised plan, subject to establishment of a Conservation and Flowage Easement over the <br /> wetland, and subject to MCWD permit approvals prior to commencement of construction <br /> activities. <br /> Page 41 of 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.