My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00424 - septic
Orono
>
Property Files
>
Street Address
>
D
>
Devin Lane
>
2265 Devin Lane - 03-117-23-22-0018
>
Septic
>
2016-00424 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:34:42 PM
Creation date
6/28/2016 2:40:54 PM
Metadata
Fields
Template:
x Address Old
House Number
2265
Street Name
Devin
Street Type
Lane
Address
2265 Devin La
Document Type
Septic
PIN
0311723220018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS ANO EZFLOW <br /> ' A. Enter Dispersal Media: <br /> B. Enter the Component: Length: �ft Width:�ft Depth:��ft <br /> C. Number of Components per Row=Bed Length divided by Component Length fRound up) <br /> �� ft : �j ft= ��components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �components X ��ft = ��ft <br /> E. Number of Rows= Bed Width divided by Component Width (Round up► <br /> � ft = U ft = C� rowS Adjust width so this is nn whote number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> � X � = C�components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Ctean Sand Lift: 3 feet minus Depth to Limiting Condition =Ctean Sand Lift <br /> 3.0 ft - 1.0 ft = 2.0 ft Design Sand Lift (optional): �f[ <br /> B. Calculate Upslope Height: Ctean Sand Lift +media depth +cover(1 ft.) = Upstope Height <br /> 2.0 ft + 0.5 ft t 1.0 ft= 3.5 ft <br /> C. Setect Upslope Berm Multiplier(based on land stope): 3.57 <br /> Land Slope g'o 0 1 2 3 4 S 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D, Calculate Upstope Berm Width: Muttiplier X Upslope Mound Height =Upslope Berm Width <br /> 3.57 ft X 3.5 ft = 13.0 ft <br /> E. Calcutate Drap in Elevation Under Bed: Bed Width X Land Stope: 100=Drop (ft) <br /> 10.0 ft X 4.0 � = 100= 0.40 ft <br /> F. Catculate Downslope Mound Height: Upslope Height + Drop in Elevation = Downslope Height <br /> 3.5 ft + 0.40 ft = 3.4 ft <br /> G. Setect Downslope Berm Multiplier(based on land stope): 4.76 <br /> land Slope g'a 0 1 Z 3 4 5 6 7 8 9 10 11 12 <br /> Downsiope 3:1 3.00 3.09 3.19 3,30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.� 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Ca[Culate Downslope Berm Width: Multiplier X Downslope Height =Downslope Berm Width <br /> 4.76 x 3.9 ft = 18.6 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Area: Downstope Absorption Width +4 feet <br /> i6.0 ft +�ft = 20.0 ft <br /> � <br /> J. Design Downstope Berm=greater of 4H and dl: 20.0 ft <br /> K. Setect Endslope Berm Muttiplier: 3.00 (usuolty 3.0 or 4.0) <br /> L. Calcutate Endslope Berm X Downslope Mound Height =Endslope Berm Width <br /> 3-� ft X 3.9 ft = 12.0 ft <br /> M. Ca(cutate Mound Width: Upslope Berm Width + ged Width + Downstope Berm Width <br /> 13.Q ft + 10.0 ft t 20.0 ft = 43.0 fi <br /> N. Catcutate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 12.0 ft + 50.0 ft + 12.0 ft = 74.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.