Laserfiche WebLink
. ' ,� �o �i� <br /> , . <br /> CITY OF ORONO SEPTICSYS'I'EI�IPER�ti-IITAPPLICATTON <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, Nl�t 55323 <br /> JOB STTE ADDRESS: G- � �' �� � <br /> ✓� t�'ci' : �l L G �� � <br /> Occupanc�� Type: Residential � Commercial Qther <br /> Permit Type: iV'e�v or Replacement Sy'stem, $100.00 <br /> Repair Existing System, $ 50.00 ' � <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Otimer's I�'a.me: �.(,�, l 1� ���� j /�� � � =� c l _ PhoneNumber: �---j 7 5-/ ����" <br /> IYlailing Address: z z-- z 5" �� r�� -��-� ( � , . _ City:/'��- 7�P� ��s�3 s E- <br /> Contractor's Name: ��, �/,'�, ; ,s Gl f� /,- �� :C, � . PhoneNumber: ��7 3-��3�'G <br /> 1��Iailing Address: �G �c -'��-' ���� �� City: c� `�, Z�p�s�3`%i <br /> DO \TOT I�IA-II., PA'Y�IENT ti�IT'H THIS APPLICATIOti' <br /> GEti'ERA-i., I�'STRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. <br /> 2, perm.its will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3, All work must be done in accordance �vith the approved septic system desi�n. Desi�n <br /> reports are not considered approved unless accompanied by thz "City of Orono Septic <br /> System Approval" cover sheec si�ned by the Ciry Inspector. <br /> 4, The follow�in� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfieid trench installation prior to coverin�. For mounds, inspection is required <br /> afcer rouQh-up bu[ prior to sand placement (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Fiaal inspection to verify proper final cover depths and to verify that alI pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holdin�MPCA Installer Certificate shall be presen[ durin� inspections: A 2`�- <br /> hour notice is required for all inspections. <br />