My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/19/2005 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2005
>
09/19/2005 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 9:36:19 AM
Creation date
3/9/2012 9:36:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION <br /> Monday,September 19,2005 <br /> 6:00 o'clock p.m. <br /> (#05-3131 STEVE BOHL,CONTINUED) <br /> 1. The proposed cul-de-sac public road has been shifted to the northeast to accommodate additional <br /> buildable area within Lot 8,which contains a small wetland. This layout leaves the church with a 60-foot <br /> setback to the road, still meeting its minimum 50-foot setback requirement. <br /> 2. The lot adjacent to the Williamson residence has been converted to an 11,230 square foot outlot, <br /> which satisfies about half of the RPUD 10 percent private recreation area requirement. <br /> 3. Wetland mitigation within the Church parcel (now lot 2)has been eliminated and the plat <br /> proposes 1600 square feet of wetland filling within Lot 8,which requires MCWD approval. <br /> 4. Each of the proposed lots includes at least 14,000 square feet of area as recommended by the <br /> Planning Commission. <br /> 5. Each lot except for Lot 5 has at least the required 90 feet of width as measured in a straight line at <br /> the proposed 30-foot front setback line. Lot 5 has approximately 88'. <br /> Gronberg noted Lot 5 has been revised slightly and now meets the 90-foot width. <br /> Gaffron noted Item 6 states: All lots but Lots 4 and 7 meet the minimum RPUD lot depth requirement of <br /> 125 feet. Lots 4 and 7 are restricted due to the dimensions of the site and the location of the cul-de-sac, <br /> leaving them slightly short at about 115'-120' in depth. The wetland in Lot 8 places some significant <br /> restrictions on the functional depth of that lot. <br /> 7. The RPUD minimum rear yard requirement is 40 feet or 20 percent of lot depth,whichever is <br /> less. Plans propose a 30 foot rear yard on Lots 3,4, 5,6, 9, and 10,which appear to substantially meet <br /> the requirement, and 35 feet—45 feet on Lots 7 and 8,where this greater setback allows the potential to <br /> retain or establish a buffer in keeping with the Conservation Design goals. The 45-foot rear setback for <br /> Lots 7 and 8 also reflects the "Manage 2"wetland protection classification established for this wetland in <br /> the new Wetland Ordinance,requiring a 25 foot buffer and a 20 foot buffer setback. <br /> 8. Each lot appears to have a buildable envelope of 75 feet by 40 feet or greater as shown on the <br /> submitted plat drawing. <br /> 9. Stormwater ponding is proposed within Outlot A adjacent to Willow Drive, and a smaller pond at <br /> the rear of Lot 6. <br /> Gaffron indicated the City Engineer has provided comments on the revised plans,which include the <br /> standard request for pavement design and geotechnical reports, drainage calculations, and level of detail <br /> required in final design plans. In addition,the City Engineer has noted that the walkout elevations on <br /> Lots 8, 9,and 10 will need to be raised and that some revisions to the street grades are necessary to <br /> prevent water from damming on the church property. <br /> PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.