My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-012065 - new septic
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail East
>
2755 Deer Run Trail East - 04-117-23-13-0014
>
Septic
>
1999-012065 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:10 PM
Creation date
6/28/2016 12:23:35 PM
Metadata
Fields
Template:
x Address Old
House Number
2755
Street Name
Deer Run
Street Type
Trail
Street Direction
East
Address
2755 Deer Run Tr E
Document Type
Septic
PIN
0411723130014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DESIGN AND SOIL BORINGS <br /> FOR AN ON-SITE SEPTIC SYSTEM <br /> FOR <br /> Dwight Post <br /> 40 Truffula Trail <br /> Orono, MN 55356 <br /> 475-9515 <br /> SITE <br /> Lot 7, Block 1 <br /> Originally Lots 1 & 2 <br /> Auditor's Subdivision No. 229 <br /> Orono, NIN <br /> BY: <br /> DH Excavating <br /> MPCA License#644 <br /> 210 2°d Street NE <br /> NYA, MN, 55397 <br /> � 467-3098 <br /> NOTE: the site must remain protected before the construction of the mound in <br /> order to protect it from soil compaction caused by vehicles driving over the sites. <br /> All property lines must be located 6efore construction begins. All setbacks must he <br /> maintained. All installation must meet Local Unit of Government codes or MN <br /> Statute 7080; whichever is greater in its restrictions. <br /> The septic sites were tested by DH Excavating in March and June of 1999. <br /> We have verified that the sites have not been destroyed and are suitable for an on- <br /> site septic system. The soils are in the same condition as when the site was originally <br /> evaluated. We will use the northerly most site for the system installation. <br /> Desi�n requirements <br /> For a five bedroom home. <br /> 750 gallons per day X .83 loading rate=630 square feet of rock bed <br /> 630 / 10 (width of rock bed)=63 lineal feet of rock bed <br /> Material requirements <br /> 2-1500 gallon tanks <br /> 1-1500 gallon lift station with an audible/visual alarm in the home <br /> 33 tons of washed binder rock <br /> 328 tons of washed concrete sand <br /> 197 tons of black loam (35 of which needs to be sandy loam for the cap) <br />
The URL can be used to link to this page
Your browser does not support the video tag.