My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00077 - new structure
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
790 Brown Road North - 34-118-23-11-0003
>
Permits/Inspections
>
2015-00077 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:30 PM
Creation date
6/27/2016 2:42:20 PM
Metadata
Fields
Template:
x Address Old
House Number
790
Street Name
Brown
Street Type
Road
Street Direction
North
Address
790 Brown Road North
Document Type
Permits/Inspections
PIN
3411823110003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Voigt & Associates, Inc. <br /> ' STR UCTURAL ENGINEERING SER VICES <br /> 4635 N[COLS RD. SUITE 204 <br /> EAGAN,MN 55122 <br /> � PH.(651)686-7727 FAX(651)686-8444 <br /> Michael Karn January 14,2015 <br /> Gonyea Homes <br /> 6102 Olson Memorial Highway <br /> Golden Valley,MN 55422 <br /> 763-432-4511 <br /> michacl@�onvcacompanics.com <br /> RE: Ho�an Residence at 790 Brown Road North,Long Lake,MN 55356 <br /> Dear Mr. Karn: <br /> Per your request,I examined the main level garage wall(left elevation)of the address above for compliance with the <br /> Minnesota State Building Code(2006 IRC)bracing requirements. Your plan notes that you will be sheathing the entire <br /> exterior of the building with OSB (method 3)permitting the use of R602.10.5 Continuous wood structural panel <br /> sheathing. Please note IRC Figure R602.10.5 Typical Exterior Corner Nailing....Stud to Stud Nailing required for the <br /> continuous method. The continuous method pern�its effective wall lengths as short as 27"for a 9' ceiling adjacent to a <br /> window opening. <br /> The attached sheet, BP 1,indicates the locations of braced wall segments for the front elevation of the garage on the main <br /> level of this house and the location of por�al frames. See Detail S 1. <br /> Additionally,per your request,I examined the stairwell wall on the plan you sent to me for the home at the above address. <br /> See Detail Tl. <br /> A basic assumption of IRC bracing is that the rest of the structure is properly constructed and connected per the appropriate <br /> section of the code. <br /> The information and opinions contained herein are based upon the limited investigation described at the beginning of this <br /> repor�.No warranties are expressed or implied regarding the existence of other unknown conditions not specifically <br /> addressed.Our work is in aecordance with generally accepted engineering standards and is not intended to be relied upon or <br /> transferred to individuals other than the addressee. Should information or conditions become known which differ from the <br /> discussion herein,they may alter the opinions or conclusions of the undersigned. <br /> Please call if you have any questions. <br /> Sincerely, <br /> P�. � � . <br /> � <br /> I Hereby Certify That This Plan,Specification,Or Report Was Prepared <br /> By Me Or Under My Direct Supervision And That I Am A Duly <br /> Licensed Engineer Under The Laws Of The State Of Minnesota. <br /> Paul W.Voigt Date l/14/15 License Number 20705 <br />
The URL can be used to link to this page
Your browser does not support the video tag.