My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail East
>
2735 Deer Run Trail East - 04-117-23-13-0013
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:09 PM
Creation date
6/27/2016 2:07:11 PM
Metadata
Fields
Template:
x Address Old
House Number
2735
Street Name
Deer Run
Street Type
Trail
Street Direction
East
Address
2735 Deer Run Tr E
Document Type
Septic
PIN
0411723130013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Percolation Test Data Sheet for hole#6 <br /> Test hole location: Lot 6,Block 1, Crysta.l Bay Preserve, Orono <br /> Date test hole was prepared June 21, 1999 <br /> Depth of hole bottom, 12 inches Diameter of hole=6 inches <br /> Soil Data from Test Hole <br /> Depth, inches Color Texture <br /> 0— 12 10YR3/2 Loam <br /> Sidewalls scratched with a stick with nails. Depth of pea rock in bottom of hole was 2". <br /> Hole initially filled on June 21, 1999 at @ 2:30 p.m. to 12"above the bottom of the hole. <br /> An automatic siphon was used to maintain at least 12" of water in the hole for 4 hours. <br /> Percolation test was conducted by DH Excavating. <br /> Percolarion tests started on June 22, 1999 at 7:25 p.m. <br /> Maximum water depth above the bottom of the hole during the test was 12". <br /> TIME 1NTERVAL WATER WATER DROP WATER DROP PERC RATE <br /> (MINiJTES) DEPTH (fraction) (decimal) CALCULATION <br /> 7:25 Start 12 <br /> 7:55 30 minutes 11 '/4 3/4 .75 30/ .75 =40 mpi <br /> 7:57 Refill 12 <br /> 8:27 30 minutes 11 '/4 3�4 .7S 30 / .75 =40 mpi <br /> 8:28 Refill 12 <br /> 8:58 30 minutes 11 '/4 3�4 .�IS 30/ .75 =40 mpi <br /> Perc rate=40 mpi <br /> Ten Percent Calculation <br /> 40 - 40 = 0 If the top number is larger than the bottom number, <br /> largest rate—smallest rate take another reading. If the top number is equal to, <br /> 40 x .10 = 0 or smaller than the bottom number, than average of <br /> smallest rate the three readings is the perc rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.