Laserfiche WebLink
, FOR�CITY USE ONLY <br /> � �,.C}1�j/� City of Orono �ace Eteoeived: // �, Pen,uc# Zo/S— D //G� '7 <br /> f �./ P.O.Box 66 bD <br /> i2750 Kelley Parkway Amounr. $_�(�' <br /> 4 � � � Crystal Bay,MN 55323 Approved By: � <br /> ,. � (952)249-4600 <br /> `��� ��' Recommends: A roval Denial <br /> � <br /> �ESH� c�-1 El <br /> __—._- ;�����_2 4��,�► �,L.�U,�n �n�J�� <br /> CITY OF ORONO—AUTOMATIC FIRE SPRINKLER/GENERAL PERMIT <br /> (All permits must be approved by the��=+9�'�3s3��;t�>�Ei and/or Building Official) <br /> 1. Permits are required for all fire sprinkler installation and repair. All work shall be done by a licensed <br /> fire sprinkler contractor. Two sets of plans, specification data sheets, fire flow tests and hydraulic <br /> calculation sheets shall be submitted to the Orono Fire Marshal a����i3�_�_r,t���i7� �}1� �lati�s h�,(�{».c� sta�-t ��f` <br /> u c>i k. <br /> 2. Permits can be applied far by mail at PO box 66, Orono, MN, 55323 or in person at, <br /> 2750 Kelly Parkway; Phone: (952)249-4600. Permits are also available online at: <br /> w«��v.ci.orono.mn.us <br /> 3. All systems shall be designed, installed and maintained to N.F.P.A.-13,N.F.P.A.-25, Minnesota State <br /> Building Code, Minnesota State Fire Code and Standards. All attic systems are to be spaced at <br /> maximum 130 square foot coverage. Plastic pipe will not be allowed at any time in attic spaces. <br /> 4. All equipment installed shall be U.L. or F.M. approved for fire protection service. Water flow test <br /> shall be completed on all new systems. Water flow test reports shall be submitted to the Orono Fire <br /> Marshal along with plan submittal. <br /> 5. Yard or wall post indicator valves are required. All indicating and control values installed shall be <br /> provided with tamper protection. On dry systems,the control valve to service the pressure switch (air) <br /> shall be supervised. <br /> 6. Inspectors test valve shall be installed on each floor level or zone of system. All systems shall have <br /> main drain and inspectors test valves piped to the outside. <br /> 7. No water is to be introduced into the sprinkler system until main has been thoroughly flushed. 200# <br /> air test and flushing shall be witnessed by the City of Orono Water Department. <br /> 8. An approved audible/visual device wired to main flow switch shall be installed above F.D. <br /> connection and in areas normally occupied by tenants. <br /> 9. EXISTING SYSTEMS: If any changes in the hydraulically most demanding area, change in <br /> occupancy classification or an addition of 20 or more heads, hydraulic calculations and flow test will <br /> be required. <br /> 10. The Orono Fire Marshal shall witness all final flow or trip tests. Appointments can be made by <br /> calling the Fire Marshall at(952) 473-9701, 8:00-4:00 p.m. Monday-Friday. 24-hours notice is <br /> requested. <br /> 1 l. When required, (30 foot building height) stairwell standpipe's shall have 2 %2 gate valves installed <br /> with 2 'h x 1 '/z caps. <br />