My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-27-2000 Council Minutes
Orono
>
City Council
>
2000
>
11-27-2000 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2012 4:03:06 PM
Creation date
3/5/2012 4:03:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />ORONO CITY COUNCIL MEETING <br />MINUTES FOR NOVEMBER 27, 2000 <br />( #6) Edward and Carol Callahan, 2545 North Shore Drive - Appeal ofAdministrative <br />Decision - Continued <br />Mayor Jabbour moved, Flint seconded, that based on the City's existing rules regarding <br />the May 1998 storm and the fact that the City has allowed all its residents to rebuild if 25% <br />of their non - conforming structure still existed, that if the structure's front panel and <br />foundation /slab is retained and it is determined that it constitutes 25% of the non- <br />conforming structure, a building permit should be issued. Also, non - conforming structures <br />should not exist in the 0 -75' setback, except this structure could be repaired based on <br />damage from the May 1998 storm. <br />Sansevere asked Gaffron if the slab could be considered structure in this case. Gaffron <br />responded that it could. <br />Vote: 3 Ayes, 2 Nays. Peterson and Kelley opposed. <br />MAYOR/COUNCIL REPORT <br />• Jabbour requested that the City send a letter to Ann Cosgrove and her family welcoming them <br />back to the City of Orono, and encouraging her to become re- involved in city activities. He <br />noted that she worked diligently on the Highway 12 project and was an asset to the City. <br />Council agreed that a letter should be sent. <br />Jabbour reported that the Planning Commission Chair requested that the opening created by Jay <br />Nygard be filled as soon as possible. Moorse responded that application information would be in <br />the next issues of the local newspapers. <br />Flint commented that information from CMD, a group that does research on construction going <br />on within the country, had been reviewed at a recent work session. In the research of 250 -300 <br />fire stations, it appears that the replacement of Long Lake fire. station estimate of $2 million is <br />reasonable. <br />PUBLIC SERVICE DIRECTOR'S REPORT <br />( * #7) Request Final Payment - East Long Lake/Fox Ridge Sewer Project <br />Flint moved, Sansevere seconded, to approve Request for Payment, East Long Lake/Fox <br />Ridge Sanitary Sewer Project to Minncomm, Inc. in the amount of $86,123.00. <br />Vote: Ayes 5, Nays 0. <br />7 -- <br />
The URL can be used to link to this page
Your browser does not support the video tag.