Laserfiche WebLink
� , PLA,N RE�IEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: � �/'��� �`C'�(/' Permit No.: <br /> Description of work: u ,b2S'�,� ip' T��/�Date Rec'd: <br /> Septic review by:__ .�2��' (NG�Ii��G- Date Approved: <br /> Zoning review by: Date Approved: <br /> Building review by: Date Approved: � � <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot overage: gF o, <br /> Survey Submitted: 0 Yes ❑ No Date of Surve . Revised date(�)• <br /> Landscape plan submitted? Yes � No Landscap : <br /> Pro osed Setbacks: � <br /> Front (Lake) Rear(Street) N S E W ( N S E W ) Other Buildings Wetland <br /> Side Side <br /> < <br /> Defined Height: Peak Height: FFE: FFE minus 6 feet= (Existing Conto� <br /> �' Perimeter(linear feet) = 0 0 = L.F. below grade <br /> Basement? 0 Yes � No, S ories <br /> FOR A BUILDING WITH A BASEMENT OR CRAW SPACE: FOR A BUILDING ON A SLAB FOUNDATION: <br /> ` The distanc etween the lowest pro osed Slab at or above grade— <br /> START W ITH floor(of th asement or crawl space) nd measure from hiQhest existinp <br /> the highe point of the roof. <br /> START WITH rade to the highest point of the <br /> roof even if fill was brought in to <br /> If you ave a... elevate home. <br /> SUBTRACTION • GABLE OR HIPPED ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract half the distance from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof hi hest oint of the roof. <br /> to the low point of the corresponding If you have a... <br /> gable or hipped roof • GABLE OR HIPPED ROOF <br /> 4 SUBTRACTION <br /> +`' • GABLE OR HIPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows): Subtract half the distance ROOF TypE the distance between the <br /> b2tween the top of the highest � highest point of the roof to <br /> window and the highest point of the the low point of the <br /> roof corresponding gable or <br /> hipped roof <br /> • ALL OTHER ROOF TYPES(flat, GABLE OR HIPPED ROOF <br /> mansard,etc):No subtraction. • (with windows): Subtract <br /> SUBTRA ION Subtract the dista�ce between the half the distance between <br /> (BASED N basemenUcrawl space floor and the the top of the highest <br /> EXISTIN highest existing grade adjacent to the window and the highest <br /> GR,4DE ) foundation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQU S efined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> � <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />