My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00574 - new septic
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
540 Big Island - PID: 22-117-23-42-0001
>
Septic
>
2016-00574 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:14 PM
Creation date
6/23/2016 9:58:40 AM
Metadata
Fields
Template:
x Address Old
House Number
540
Street Name
Big Island
Address
540 Big Island
Document Type
Septic
PIN
2211723420001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Basic Pump Selection Design g. <br /> MinnesotaPollution Worksheet UNIVERSITY � ��,;x <br /> Control Agency <br /> OF MINNESOTA °� "Z-Z�" <br /> 1. PUMP CAPACITY Project ID: v 04.20.2016 <br /> Pumping to Gravity or Pressure Distribution: Gravity <br /> 1. If pumping to gravity enter the gallon per minute of the pump: 20.0 GPM 1�0-45 gpm) <br /> 2. If pumping to a pressurized distribution system: �GPM <br /> 3. Enter pump description: <br /> 2. HEAD REQUIREMENT$ a��,�>�""�o+e�una:9m <br /> A. Elevation Difference �ft � <br /> S.Wp\b�w�0��9`�. <br /> between pump and point of discharge: - <br /> �� ��»� i.� e�a,;�:•-. <br /> B. Distribution Head Loss �ft mn.�.Me <br /> I , - - --- -- - -- - <br /> C. Addi[ionalHeadLoss: �ft(duetospecialequipment,etc.� � F------------ - - <br /> Table I.Friction Loss in Plastic Pipe per 100ft <br /> Distribution Head Loss <br /> Gravity Distribution = Oft Flow Rdte ____ P_ es) <br /> Pi e Diameter I�nc <br /> (GPM) t 1.25 1.5 � 2 . <br /> Pressure Distribution based on Minimum Average Head 10 9.1 3.1 1.3 0.3 <br /> Value on Pressure Distribution Worksheet_ �2 �2,8 4.3 1.8 0.4 <br /> Minimum Avera e Head Distribution Head Loss �4 17.0 5.7 2.4 0.6 <br /> 1ft 5ft 1b 21.8 7.3 3.0 0.7 <br /> 2ft 6ft 18 9.1 3.8 j 0.9 <br /> 5ft loft 2� I ��,� 4,6 1.1 <br /> 25 16.8 6.9 1 J <br /> D. 1.Supply Pipe Diameter: 2.0 in 30 23.5 9.7 2.4 <br /> 35 12.9 3.2 <br /> 2.Supply Pipe Length: 40 ft 40 16.5 4.1 <br /> E. Friction Loss in Plastic Pipe per 100ft from Table I: 45 I 20.5 5.0 <br /> 50 6.1 <br /> Friction Loss= 1.12 ft per 100ft of pipe 55 � 7.3 <br /> 60 I 8.6 <br /> F, Determine Equivalent Pipe Length from pump discharge to soil dispersal area discharge 65 10.0 <br /> point. Estimate by adding 25q to supply pipe length for fitting loss. Supp(y Pipe Length 70 11.4 <br /> �D.2) X 1.25=Equivalent Pipe length 75 13.0 <br /> 40 ft X 1.25 = 50.0 ft 85 16.4 <br /> 95 i 20.1 <br /> G. Calculate Supp(y Friction Loss by multiplying Friction Loss Per f00jt (Line E)by the Equivolent Pipe Length (Line F)and divide by 100. <br /> Supply Frtction Loss= <br /> 1.12 ft per 100ft X 50.0 ft - 100 = 0.6 ft <br /> H• To[al Heod requirement is the sum of the E(evotion Difference (Line A),the Distnbution Head Loss(Line B),Additional Head Loss(Line C),and <br /> the Supply Friction Loss(Line G ) <br /> 6.0 ft + �ft + �ft � 0.6 ft = 6.6 ft <br /> 3. PUMP SELECTION <br /> A pump must be selected to deliver at least 2Q,Q GPM(Line 1 or Line 2)with at least 2�,0 feet of totat head. <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.