My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-P03067 - septic
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail East
>
2695 Deer Run Trail East - 04-117-23-13-0012
>
Permits/Inspections
>
2000-P03067 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:08:04 PM
Creation date
6/20/2016 1:27:50 PM
Metadata
Fields
Template:
x Address Old
House Number
2695
Street Name
Deer Run
Street Type
Trail
Street Direction
East
Address
2695 Deer Run Tr E
Document Type
Permits/Inspections
PIN
0411723130012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S�P TESTIN�V� �NC. Steven B. Schirmers • MPCA Cert.No. 627 <br /> ��51 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License #394 <br /> September 15, 2000 <br /> Steiner& Koppelman „ <br /> �-���� �_�qs c��n- I��� Ti�. <br /> , <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatrrient system is designed for a Type 1, six bedroom home, in <br /> accordance with the Minnesota Pollution Controt Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site are a clay loam to loam. The seasonally saturated soils were <br /> located at 26" to 36" (redox:features). Due to the seasonally saturated soils, a <br /> Pressurized Mound Systerri will need to be installed to treat septic effluent. The bottom <br /> of the rock must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" liave a percolation rate of 4.7 mpi. <br /> A pumping chamber will ne��d to be installed to lift the effluent to the treatment area. <br /> The power supply and switc:hes must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The socl layer be(ow the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.