Laserfiche WebLink
Percolation Test Data Sheet for hole#2 <br /> Test hole location: Lot 5, Block l, Crystal Bay Preserve, Orono <br /> Date test hole was prepared June 21, 1999 <br /> Depth of hole bottom, 12 inches Diameter of hole= 6 inches <br /> Soil Data,from Test Hole <br /> Depth, inches Color Texture <br /> 0— 12 10YR3/2 Loam <br /> Sidewalls scratched with a stick with nails. Depth of pea rock in bottom of hole was 2". <br /> Hole initially filled on June 21, 1999 ai @ 2:30 p.m. to 12" above the bottom of the hole. <br /> An automatic siphon was used to maintain at least 12"of water in the hole for 4 hours. <br /> Percolation test was conducted by DH Excavating. <br /> Percolation tests started on June 22, 1999 at 4:55 p.m. <br /> MaYimum water de th above the bottom of the hole durin the test was 12". <br /> TIME INTERVAL WATER WATER DROP WATER DROP PERC RATE <br /> (NIlNUTES) DEPTH (fraction) (decimal) CALCULATION <br /> 4:55 Start 12 <br /> 5:25 30 minutes 11 1/0 3/< .75 30/ .75 = 40mpi <br /> 5:26 Refill 12 <br /> 5:56 30 minutes 11 '/4 3/4 .75 30 / .75 = 40mpi <br /> 5:58 Refill 12 <br /> 6:28 30 minutes 11 '/4 3�4 ./S 30/ .75 = 40mpi <br /> Perc rate= 40 mpi <br /> Ten Percent Calculation <br /> 40 - 40 = 0 If the top number is larger than the bottom number, <br /> largest rate—smallest rate take another reading. If the top number is equal to, <br /> 40 x .10 = 0 or smaller than the bottom number,than average of <br /> smallest rate the three readings is the perc rate. <br />