Laserfiche WebLink
To: Street File - 2690 Deer Run Trail East <br /> From: Chris Pence, On-Site Systems Manager� <br /> Subject: Septic Sites <br /> Date: December 5, 2000 <br /> The proposed septic sites at the above stated property appear to meet all minimum requirements of <br /> Chapter 7080 and the Orono Septic Code except one. The mound area it self is not compacted but <br /> there is compaction within twenty feet of the toe of the mound. The compaction actually comes right <br /> up to the toe of the mound. I have talked with the property owner(Jon Stern) and he does not plan <br /> to build on the site for 2-3 years. Steve Schirmers of S-P Testing recommends to rip the soil 18" <br /> deep in the compacted area around the mound. This should help loosen up the soil and assure <br /> movement through out the soil profile. <br /> Enclosed is a copy of the letter received from Mr. Schirmers recommending to rip the soil around <br /> the sight. This appears to be the best solution to break up the soil and loosen up the compaction. <br /> The soil ripping should only occur in the area of compaction and not in the designated mound site. <br />