Laserfiche WebLink
� <br /> ��r��M <br /> � O � CITY OF ORONC) <br /> � �� SEPTIC SYSTEi��I APPROVA�. <br /> � ,;; � '� <br /> ( -�:�;�:�� �,. �IT'� �� ��i��T(� <br /> � { <br /> p � ,,,,,�-,.... ,� hz�,�,�o�-�� <br /> � <br /> � �l �,�r�%'l ��dl�� ti Post OfS'ke Box 66 <br /> '�� `����� ��1�. �j/ Crystal Bay,Nlinnesota 5532.3-0066 <br /> r „�� <br /> ' 4�1'�{C��' '�,�,� <br /> �kESH� j <br /> � <br /> LOCATION: 2965 Deer Run Tr. _ <br /> OWNER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S—P Testing �pORT DATE: December 11, 1993 <br /> The City of Orono has Approved your on-site system design as of July 2 7, 19 9 5 <br /> (appraved-disapproved) (date) <br /> wi[h the following conunents: <br /> . <br /> THIS IS NOT A PERI�IIT. Tl�is is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> rdOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not he granted until the Il�spections Department <br /> has verified that prirnary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Cc,mpaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. i <br /> A si�e copy will be available at the City Offices for the septic contractor. <br /> CITY OF ONO <br /> ,�'�? <br /> By �' rt' l/ <br /> Stephen ec an, On-site Systems Manager <br /> T'ELEPI i0[YG-473-7357• FAX-473-Q510 <br />