Laserfiche WebLink
1 � <br /> CITY OF ORONO SEPTIC SYSTEM PERi�ITT APPLICAT'IO� <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, I��1 55323 <br /> _--_ ._ � <br /> JOB SITE ADDRESS: ��� S ���r. j?�ir� j�,r�, <br /> Occupancy Type: Residential � Commercial Other <br /> Permit Type: New or Replacames emystem, � 50.00 ���� r; n <br /> Repair E�stinb Sy � <br /> (Tanks or Drainf eld) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: PhoneNumber: <br /> 1�Iailing Address: City: �� <br /> Contractor's Name: �w /�•�- ��'����%C-- �oneNumber: �J�� -s-f3s�` <br /> ,.� � c�ty:����� �� s S-��1� <br /> i�iailing Address: �SZo �C �✓' �'�� � � <br /> DO NOT MAII� PAYMENT WITH THIS APPLICATION <br /> GEiVERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Desian <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4, The followin� inspections will be required for all septic systems: <br /> �,. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rouQh-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper fmal cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual holding MPCA Installer Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />