Laserfiche WebLink
CITY OF ORONO SEPT`IC SYSTEM PIIZMIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NIN 55323 � � ��� �c,l� � . <br /> JOB SITE ADDRESS: �� ��`, � � �c"� "v v� <br /> Occupancy Type: Residential �_ Commercial Other <br /> Permit Type: New or Replacement System, $100.00 <br /> Repair Existing System, $ 50.00 <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> Owner's Name: ���-1� ��� � i����-PhoneNumber: <br /> S�i�i�:... �p: 5-33 <br /> Mailing Address:�� � / �l�' �-` � Y f�' City. �_�a.�.:, ���r c <br /> Contractor's Name: � 1�;v-�v' �-{ ,(� � PhoneNumber: 7 Z 3 � l s� � <br /> Niailing Address: 3� �t S�«, �u��_�'�� = _ City: �P� <br /> Slnc, tc��c` pin..,. S S 3`)4. <br /> DO NOT MAIL PAYMENT WITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a Ciry of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractore <br /> B. Tank installation prior to covering. �pection is required <br /> C. Drainfield trench installation prior to covering. For mounds, <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br /> hour notice is required for all inspections. <br />