My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010259 - new septic system
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2815 Deer Run Trail -04-117-23-24-0008
>
Septic
>
1998-010259 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:10:43 PM
Creation date
6/16/2016 2:05:01 PM
Metadata
Fields
Template:
x Address Old
House Number
2815
Street Name
Deer Run
Street Type
Trail
Address
2815 Deer Run Tr
Document Type
Septic
PIN
0411723240008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�' - <br /> ���" ��'ESTING, INC. Steven B. Schirmers — MPCA Cert. No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> ��� ���� ��� December 10 , 19 9 3 <br /> �� <br /> Coffin Site <br /> Lot l , Block 1 <br /> Orono , Henn. Co. , MN <br /> This On-Site Sewaye Treatmer�t System is Designed for a lype 1 , five <br /> bedroom home in accordance with the Minnesota Pollution Control <br /> Agency Chapter 7080 anc] local ordinances . <br /> The soils on this site are SCS soils mapped - LsC2 - Lester clay <br /> loam. A seasor�aliy t�iyr. water tabl� was located at 16" to 34" <br /> (mottled soil ) . Due to the seasonally high water table, a <br /> Pressurized Mound System will need to be installed. The bottom <br /> of the rock beu musL be located at ieast 3 ' above the seasonally <br /> high water table . <br /> The soils at a depth of 12 " llave d percolation rate av�raging <br /> 14 . 1 min/inch . <br /> A pumping chamber will need to be installed to lift t;ze effluent <br /> to the treatment area . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber. The distribution pipes shall have their ends capped . Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over , just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure . A warning device must <br /> be installed witYi a liglit and sound device , this is in case of a pump <br /> failure . Mercury floats are a good method . <br /> All neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area . <br /> CONT ' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.