Laserfiche WebLink
. � (G �s� <br /> ' CITY OF ORONO SEPTICSYSTE1�iPERI��IITAPPLICA'�ION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, NIN 55323 <br /> JOB SITE ADDRESS: "�� �S l S D�a� ��.� �; � <br /> Occu ancti� Type: Residential (/ Commercial Other <br /> P <br /> Permit Tti•pe: IV'ew or Replacement SS�stem, �100.00 C/ <br /> Repair ExistinD System, � 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> *See fee schedule for non-residential permit fees <br /> O�mer's I�'a.me: �W�R��-s L_�:�� ( � PhoneNumber: �J� ' s�7/ <br /> I�Iailing Address: ' �- Z �,v��'� �r- City:(�.���.►Q �P� ��/��-� <br /> Contractor's I�Tame: os�►6r ;rta� Phonei\'umber: �f�-�S - ?3�� <br /> � ��> City: ��. (,�-�'`�- Zip: �'�� <br /> Nlailing Address: Z32�� /D� �� <br /> DO \TOT �IA.IL, 1'AI'I1��IENT ti�TI'H THIS APPLICATIO�' <br /> GE�rERAL Lti'STRUCTIONS <br /> 1, Applications for septic system permi[s may be mailed or submitted in person at the City <br /> Offices; however, permics will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must no[ bejin unless the permit card is on the job <br /> site. <br /> 2, Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi�n. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> Syscem Approval" cover sheec si�ned by the City Inspector. <br /> 4, The follow�in� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required <br /> after rouQh-up but prior to sand placement (sand will be jar tested for silt contenc), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Final i.nspection to verify proper final cover depths and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> $, Individual holdin�MPCA Installer Certificate shall be presenc durinj inspections: A 24- <br /> hour notice is required for all inspections. <br />