My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/19/1992 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1990-1999
>
1992
>
10/19/1992 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2012 9:12:29 AM
Creation date
2/28/2012 9:12:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION MEETING <br />HELD OCTOBER 19, 1992 <br />ZONING FILE #1766 - CONT. <br />Eisinger answered 100,000 cub i c yards to get to the original grades <br />approved with the first application. <br />Mabusth stated there was only one problem reported with respect to <br />the construction schedule. <br />Chair Kelley asked about the junk and debris on the property and <br />asked if the removal of that be a condition of approval. <br />Mabusth concurred and explained that the engineer has recommended <br />seeding of the slopes this fall. <br />Eisinger felt the weather may not permit that to be completed. <br />Johnson indicated he thought this to be a benefit, and asked if <br />they intended to provide a clay seal to shed water. <br />Mabusth stated the interior areas are not yet filled and are still <br />receiving fill. <br />Bellows asked about a deadline for the completion of the project. <br />Mabusth stated the applicant does not have knowledge at this time <br />of any additional fill to be obtained. <br />Bellows stated they need to achieve the knowledge for an adequate <br />solution. She asked how long they could control a dangerous <br />situation on Highway 12. She mentioned this project is also costly <br />to the City in terms of engineering reviews. <br />Mabusth asked Eisinger if he has equipment to grade the fill. <br />Eisinger stated as a condition of accepting the fill, the <br />contractor is required to do the necessary grading work. <br />Mabusth noted the applicant has filed for a conditional use permit <br />of 20,000 cubic yards, and there is an additional 3,000 cubic yards <br />from the Stubbs Bay sewer project. <br />It was moved by Cohen, seconded by Rowlette, to recommend approval <br />of Application #1766 for Howard Eisinger, 3245 Wayzata Boulevard, <br />for a conditional use permit to permit filling and grading <br />activities in excess of 100 cubic yards for a period of two years, <br />subject to all conditions of the original approval resolution, and <br />the junk and debris be removed and seeding to be done by May 31, <br />1993. Ayes 7, nays 0. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.