Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Septic System Upgrade Deadline is Approaching <br /> Here's a friendly reminder to all Orono property owners with non-compliant onsite septic <br /> systems. Beginning in the mid-1990s the City began to identify those septic systems that <br /> made use of trench drainfields, a majority of which do not maintain the minimum <br /> required vertical separation above seasonal water tables. Each existing system was <br /> subjected to soil borin�s to determine the seasonal water table depth. When a system was <br /> identified as non-compliant, the owner was notified of the need to bring the system into <br /> compliance and given several years to complete the upgrade. <br /> The deadlines to�upgrade were divided into whether or not the property was in the <br /> Shoreland District (within 1000' of a lake, or within 300' of a protected tributary stream). <br /> Properties in the Shoreland District were given until December 31, 2007 to become <br /> compliant. Properties outside the Shoreland area with non-compliant systems were <br /> allowed until December 31, 2010 to conform to the septic code. <br /> Don't wait until the last minutel The City is strongly recommending that�roperty <br /> owners not wait until the deadline arrives to bring their systems into compliance. The <br /> process to upgrade your septic system can be quite lenb hy. The first step in the process <br /> is to hire a site evaluator & designer to determine what type of system is required and <br /> provide the blueprint for the system installation. The property owner must then contract <br /> v�r:th a septic system insta?ler to ha�je the system const:l:cted. <br /> The installation of septic systems is very weather dependent, especially for mound <br /> systems, which can onTy be installed when the ground is relatively dry, i.e. typically June <br /> thru September. Contractors' schedules fill up quickly, so it's important to start your <br /> plazuiing and desi`n process now to ensure a timely installation. The period of time from <br /> deciding to update your septic system to the actual installation can easily eaceed three to <br /> four months or more. Please contact the Building and Zoning Department at (952-249- <br /> 4500� �a�ith any luestions yo�_t may have about brin�in� your septic system into <br /> compliance. <br /> For a list of licensed designers and 'nnsta�lers you anay go ta ���������.�a.�r�a��.��,.e��, <br /> �:➢ic➢c on City Departrnents, ctic�: on Septic, then cflick on the lin�: to <br /> w�vw.�ca.state.mn.us!Uro�rams. <br />