Laserfiche WebLink
MINUTES OF THE ORONO PLANNING COMMISSION MEETING OF OCTOBER 21, 1991 <br />• ( #2) #1695 THOMAS & ALICE STUCK AND JOHN M. BAUER, <br />4345/4365 NORTH SHORE DRIVE - <br />A) SUBDIVISION OF A LOT LINE REARRANGEMENT <br />B) VARIANCE TO THE MORATORIUM ORDINANCE #96, 2ND SERIES <br />PUBLIC HEARING 8:20 -8:27 P.M. <br />Thomas and Alice Stuck were present for this application. <br />It was moved by Chair Kelley, seconded by Johnson, to approve the <br />variance to the moratorium Ordinance #96, Second Series for <br />Application #1695 to allow a subdivision of a lot line <br />rearrangement for 4345 and 4365 North Shore Drive, based on the <br />unique characteristics of the lots, no new lots being created, <br />and this rearrangement was suggested by the Planning Commission <br />in an earlier variance application for the Stucks. Ayes 6, nays <br />0. <br />Gaffron explained that this is a request for subdivision of a lot <br />line rearrangement to increase the size of the Stuck property and <br />to place the existing garage within their property boundaries. <br />Applicants are also requesting a revision in their prior variance <br />approval to be allowed to construct the portion of deck that was <br />previously denied, now that the property will increase in area. <br />It was moved by Chair Kelley, seconded by Cohen, to recommend <br />• approval of Application #1695 for Thomas and Alice Stuck and John <br />M. Bauer, for properties at 4345 and 4365 North Shore Drive, for <br />a subdivision of a lot line rearrangement, and to further allow <br />the deck addition of 180 s.f. additional hardcover. Ayes 6, nays <br />0. <br />(06) ROBERT J. BILGER, <br />4005 NORTH SHORE DRIVE - <br />VARIANCES - PUBLIC HEARING 8:30 -8:39 P.M. <br />The Affidavit of Publication and Certificate of Mailing was <br />noted. <br />Robert Bilger was present for this application. <br />Mabusth explained that the applicant is requesting setback and <br />hardcover variances to construct a detached garage. Staff has <br />suggested moving the garage 5' to the north to allow use of a <br />proposed backout apron. A 15' setback is required because the <br />garage and workshop are over 750 s.f. and the garage would be 8' <br />from the side lot line if moved 5' to the north. She noted that <br />the workshop is to the north of the garage. <br />Bilger indicated that they intend to drive in and back out the <br />entire length of the driveway and need to maintain the garage at <br />the proposed location. <br />• Mabusth stated that the garage was recommended to be moved <br />because of the backout apron shown on the plans. <br />