Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 15,2002 <br /> 6:30 o'clock p.m. <br /> (#02-2771 Orono Ambar,Continued) <br /> Frank Dunbar, Orono Ambar, indicated his concept is to bring forward a senior housing building similar <br /> to what is currently being constructed. Dunbar stated they are proposing to bring this building <br /> substantially forward, noting that the proposed building and parking will cover six percent less on the <br /> site than the office building which will enable them to save some landscaping in the area. <br /> Dunbar indicated they are also proposing to reconstruct the retaining wall that is currently on the <br /> property and replace it with a 4.5 foot retaining wall. In addition, there will be a number of pine trees <br /> placed near it that will also help to hide the garage. <br /> Dunbar reported according to the research conducted by Maxwell Consultants, this area is substantially <br /> undersized in its housing for seniors. Currently 40 percent of the first building is leased, with over 100 <br /> other people expressing interest in leasing a unit. Dunbar stated in his view that helps to demonstrate <br /> the need for additional senior housing in this area. <br /> Dunbar indicated the senior housing building will also reduce the traffic impact to this area and will <br /> require fewer parking spaces than the office building. Dunbar compared the differences of the proposed <br /> senior housing building with the office building,noting that the parking and amount of traffic generated <br /> with the senior housing building would be significantly less in his view than an office building. Dunbar <br /> noted the building would also be located 110 feet from the property line whereas the office building <br /> would be located 75 feet. Dunbar indicated the height of the two buildings is relatively the same, with <br /> the senior housing building being 27 feet high. <br /> Gaffron stated within PUD No. 2A the only uses that would be allowed are those uses designated by the <br /> 2000-2020 Comprehensive Land Use Plan. The property included in PUD No. 2A had been zoned B-1, <br /> Retail Sales Business District for at least 35 years prior to its rezoning to B-6 PUD in 2001, and has <br /> been formally guided for commercial use since adoption of the 1980 CMP. <br /> In 2001, Orono amended the draft 2000-2020 CMP to reguide Lot 2 for Multi-family Residential use, <br /> specifically for senior housing. Gaffron indicated the impacts to the adjacent residential neighborhoods <br /> are likely to be less intense than most of the potential commercial uses that could be established if the <br /> site remains guided for commercial use. The impacts of residential traffic through Lot 2 are expected to <br /> be less than if Lot 1 is developed commercially. Additionally, the limited direct access to Highway 12 <br /> makes Lot 1 a relatively unattractive site for high traffic commercial uses. Gaffron stated there clearly <br /> is a demand in this area for senior housing, and development of additional senior housing will be in <br /> keeping with the City's affordable and lifecycle housing goals as defined in the CMP and is within easy <br /> walking distance of downtown Long Lake. Further, senior housing would provide a reasonable <br /> transition between the single family housing to the north and the commercial/retail uses to the west and <br /> south. <br /> Gaffron stated the proposed 50-unit building on this 2.6 acre site would yield a development density of <br /> approximately 19 units/acre. This density can be allowed only via a rezoning to RPUD. Gaffron noted <br /> phase one of this project was 62 units, with a 15 or 16 unit per acre density. Gaffron stated in order for <br /> the City to accomplish some of its housing goals,higher density is required. <br /> Gaffron stated the developer is requesting essentially the same development parameters that were <br /> previously approved by the Council for phase one of this project. Gaffron stated the units will all be <br /> PAGE 15 <br />