My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2001
>
01-17-2001 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 2:17:56 PM
Creation date
2/27/2012 2:17:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br /> Wednesday,January 17, 2001 <br /> (#2639 Zoning Code Amendment, Continued) <br /> Bellows inquired whether it goes to the railroad tracks. <br /> Gaffron stated the new Comprehensive Plan identifies an area east of Willow Drive between the <br /> tracks and Watertown Road that has been guided for single family/higher density. Gaffron stated that <br /> area could potentially be developed through the RPUD standards and could be included in the <br /> Highway 12 corridor study area. <br /> There were no public comments relating to this matter. <br /> Kluth moved, Berg seconded,to recommend approval of Application#2639, Zoning Code <br /> Amendment, Orono Municipal Zoning Code, Section 10.52. VOTE: Ayes 4,Nays 0. <br /> (Item Nos. 7 through 11 follow Item 12) <br /> (#12) #2651 STEPHEN LONGMAN BUILDERS,INC., ON BEHALF OF ROBIN & <br /> JEREMY BUPP, 2696 CAROLINE AVENUE, VARIANCES, 7:09 p.m.—8:09 p.m. <br /> Jeremy Bupp, Property Owner, and Stephen Longman, Builder, were present. <br /> The Certificate of Mailing and Affidavit of Publication were noted. <br /> Weinberger stated the Applicants were issued a building permit on June 20, 2000,to construct <br /> a new house on this property. A temporary certificate of occupancy has been issued on <br /> January 17, 2001,as the house is considered complete subject to a few conditions that still need to be <br /> met before the final certificate of occupancy can be issued. Weinberger stated some grading <br /> issues still need to be completed as well as installation of drain tile and excavation of the <br /> drainage swale. <br /> Weinberger stated at the time the building permit was approved,the site plan did meet all the <br /> requirements of Orono's Ordinances and the State Building Code. A later review <br /> of the site plan, which occurred after the City received some phone calls from the adjoining <br /> property owners, discovered that the original site plan submitted by the surveyor was incorrect with <br /> regard to the 75 foot lakeshore setback. A new survey was submitted depicting the correct shoreline, <br /> with a small portion of the property being located within 75 feet of the lakeshore that was not <br /> originally deducted from the buildable portion of the lot. <br /> Weinberger stated this created a situation where the owners were required to omit certain items <br /> of hardcover on the property to remain within the 25 percent requirement. The areas that do <br /> reflect the changes to the site plan relate to a patio, which has not been constructed, and to the <br /> driveway, which has been constructed to a minimal ten foot width. It was determined by City <br /> Staff and the property owners that the ten foot width was the minimum width that could be <br /> constructed and still be able to fully utilize the three-stall garage on the property. <br /> Weinberger stated since the mistake on the survey was not found until after the house was almost <br /> completed, it was difficult to make any revisions to the plan. The grading plan submitted by the <br /> Applicant does address concerns raised by City Staff concerning the property, with drainage swales <br /> PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.