My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-17-2001 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2001
>
01-17-2001 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 2:17:56 PM
Creation date
2/27/2012 2:17:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE ORONO PLANNING COMMISSION <br /> Wednesday,January 17, 2001 <br /> (#2640/2641 Orono Amber, Continued) <br /> or the proposed new Comprehensive Plan. <br /> Weinberger indicated the subject parcel was platted as Outlot F. The parcel being immediately to <br /> the south of the Sugarwoods residential development. It was intended at the time this property <br /> was developed that it would need to be replatted to a buildable lot status. <br /> The City of Orono has been looking for a development that would be compatible with the <br /> surrounding properties,the residential to the north and commercial uses to the south. <br /> The Applicant is proposing to rezone the property from B-1 to B-6 and RPUD. The rezoning would be <br /> a down-zoning of the property,with the lot containing the senior housing building being rezoned to <br /> the RPUD District, and the property to the west being rezoned to B-6, which would allow general <br /> office type uses. <br /> Weinberger stated the senior building is located with the majority of the building towards the <br /> southern portion of the lot. The building is a three story building which will be platted as <br /> separate condominiums and owned by a non-profit organization. The portion of the building <br /> located closest to the residential area will be a two-story structure. The intent of the RPUD <br /> District is to provide housing to meet lifecycle and affordable and moderate cost housing needs. <br /> With this type of housing, it may require the buildings to exceed the 30 feet maximum height <br /> standard that applies to single family residential homes and office buildings. <br /> Weinberger stated the proposed office building would consist of two stories with approximately <br /> 23,000 square feet of gross floor space. Also being proposed under the building is a 21 stall <br /> underground parking area. The building is designed to step down from a two-story structure to <br /> one story immediately adjacent to the Sugarwoods neighborhood. <br /> Weinberger indicated the general concept approval that is being requested this evening is <br /> required as part of the Highway 12 PUD and the rezoning. General concept approval is similar <br /> to preliminary plat approval. The City will not approve the preliminary plat until sometime later in the <br /> application process because the developer of this particular development is seeking financial <br /> assistance from the City,with the TIF revenues being utilized to help offset some of the costs <br /> of development, landscaping, roadways,trails,and to help keep the costs affordable. <br /> Weinberger stated the primary change between this plan and the original plan consists of a trail <br /> connection that would be made through the property eventually connecting out to the east side. <br /> The trail connection is important because of the type of use within the building. Weinberger noted <br /> a City trail also exists in this area located north and south along Brown Road, with the proposed <br /> trail ultimately connecting to the regional trail system. <br /> Weinberger stated Lot 1 consists of 2.7 acres, which is designated for the office building, and <br /> Lot 2 consists of 4 acres designated for the senior housing facility. <br /> Weinberger stated if the Planning Commission should recommend approval of the general <br /> concept, Staff would prepare a resolution defining all the necessary requirements that would need <br /> to be met by the developer prior to final approval. <br /> PAGE 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.