My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Streetscape Alternatives <br />Option C <br />Median TreaTMenTLineal Foot Cost: $152.77Total LF. of Median Treatment: 2,160 lf.Total Cost for Corridor: $330,000 <br />INCLUDED IN MEDIAN TREATMENT:• architectural elements (i.e. decorative raised curb, banner poles/lights, civic signage, dense landscaping)• perennials and ornamental grasses, • modified planting soil, • irrigation allowance <br />Boulevard TreaTMenTSquare Foot Cost: $1.98Total SF. of Boulevard Treatment: 67,860 sf.Total Cost for Corridor: $135,000 <br />INCLUDED IN BOULEVARD TREATMENT:• perennials and ornamental grasses • street trees• modified planting soil for trees <br />roundaBouT TreaTMenTSquare Foot Cost: $28.19Total SF. of Roundabout Treatment: 5,320 sf.Total Cost for Corridor: $150,000 <br />INCLUDED IN ROUNDABOUT TREATMENT:• architectural elements (i.e. decorative raised curb, banner poles/lights, civic signage, dense landscaping)• street trees• perennials and ornamental grasses, • modified planting soil, • irrigation allowance <br />opTion c ToTal STreeTScape coSTS: $605,000 - $710,000 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 23 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.