Laserfiche WebLink
ORONO PLANNING COMMISSION MEETING <br /> MINUTES FOR JANUARY 19, 2000 <br /> • (#2555 Hennepin County, Continued) <br /> required to permit the storage facility to exceed the maximum allowed size for an oversized <br /> accessory structure on this lot. A conditional use permit is required for the grading on the <br /> property and construction of the stormwater management pond. <br /> City Staff is recommending approval of Alternative A to amend the code and approve variances <br /> for the structure, a conditional use permit for the use as a County Highway Maintenance <br /> Facility, and a conditional use permit for land alteration on site. Staff is recommending approval <br /> based on the following conditions: <br /> 1. A final drainage and erosion control plan is submitted by Hennepin County and approved by <br /> the City Engineer. <br /> 2. Drainage calculations are approved by the City Engineer. Drainage rates shall not be increased. <br /> 3. Final engineering details for pond construction and control structures are approved by the <br /> City Engineer. <br /> 4. Permits and/or approval by the MCWD and Corps of Engineers of grading and drainage on site. <br /> 5. The three separate tax parcels are combined into one lot. <br /> 6. Any future expanded use of the property shall require a conditional use permit amendment. <br /> 7. Restrictive covenants shall be recorded on the chain of title to the property alerting property <br /> • owners of WCA protected wetlands. <br /> 8. A conservation and flowage easement shall be granted over the stormwater pond. <br /> 9. The county facility shall remain as a site primarily for winter County Highway Maintenance. <br /> 10. All outdoor storage shall be limited to approved parking areas and screened from immediate <br /> view to residential properties. <br /> 11. The direct source of outdoor lighting shall not be visible to adjacent properties. A final <br /> lighting plan shall be submitted for final approval. <br /> 12. A restrictive covenant is filed on the chain of title stating conditions for an oversized <br /> accessory structure. <br /> 13. Building and Land Alteration Permits will not be issued until all requirements of the conditional <br /> use permit are satisfied. <br /> Weinberger stated the Planning Commission may chose to approve the application as presented <br /> by Hennepin County, approve the variances to permit construction of the salt storage facility and a <br /> conditional use permit to allow land alteration under the existing non-conforming use of the site, <br /> or to recommend denial of the application, which will mean the site will continue to exist as a <br /> legal non-conforming use. <br /> Guy Nowlan and Greg Chock had no comment. <br /> • Mike O'Connor inquired whether the height of the proposed building would block the neighbors' <br /> view of the lake. <br /> Page 15 <br />