Laserfiche WebLink
Chr�stine�Mattson <br /> From: Jesse Struve O�O <br /> Sent: Monday, June 25, 2012 12:27 PM �0� <br /> To: Melanie Curtis; Christine Mattson � <br /> Subject: 20120625 3980 Dahl Rd -#2012-00489 <br /> Melanie, <br /> I have reviewed the grading plan for the proposed permit (plan dated 5/30/12) and have the following comments: <br /> • The plans show retaining walls being installed up to the 75' setback line, but does not show any proposed <br /> contours next to these walls. Grading will be required to take place next to these walls which will extend into <br /> the 0-75' zone. The proposal should indicate how much earth will be moved and if more than 10CY of material <br /> is planned to be moved, a Conditional Use Permit would be required. <br /> • The retaining walls by the lake do not have the correct spacing between the walls and require plans and <br /> specification signed by a professional engineer. The spacing between the walls need to be 2x the height of the <br /> taller wall. Currently the plan shows a height of the middle wall at 3.5' so the spacing between the walls needs <br /> to be a minimum of 7' or provide a plan signed by a registered engineer. The walls are currently shown to be <br /> approximately 4-5' apart (scaled off). <br /> • A portion of the retaining wall by the driveway is called out to be 4' in height. If changes are made in the field <br /> and the final height of the wall exceeds 4',the applicant will be required to submit engineering plans for the <br /> wall. <br /> • Just north of the City's sanitary sewer lift station, there is an area of significant erosion. In order to minimize the <br /> impact of the work to the homeowner,the City would want to work with the builder to correct this issue during <br /> construction of the home. Currently,the City does was not planning on doing this work immediately, but if the <br /> contractor would be willing to assist our Public Works Department, we would be willing to correct this issue this <br /> year. The help needed would be to create an access path to the area of the erosion path and would require a <br /> few trees to be removed. In turn the City would be willing to provide the labor, materials, and equipment to <br /> correct the erosion currently taking place. <br /> If you have any additional questions, please contact me. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> �, <br /> - C /�>� - C C`�%�''/ <br /> 1 =�l} �% /�Cr G��l /�c� <br />