Laserfiche WebLink
� , <br /> ; <br /> . <br /> Apri130, 2012 <br /> 3645 Crystal Place <br /> Page 2 of 2 <br /> Finally, to address your safety concerns for your renters, the platform that was started without a permit <br /> must be disassembled. Building code requires the French doors to have a code compliant guard rail <br /> installed. The property will be inspected on May 3, 2012 for compliance. Additionally, a final inspection <br /> should have been scheduled and approved before the home was occupied. Piease call for a final <br /> inspection before May 3, 2012. <br /> The above information is required in order for the plan review to continue. Please feel free to contact <br /> me at 952.249.4620 or by email at cmattson(c�ci.orono.mn.us if you have any questions. <br /> Sincerely, <br /> CITY OF ORONO <br /> \ <br /> � <br /> rv <br /> Christine Mattson <br /> Planning Assistant <br /> c Lyle Oman, Building Official <br /> enclosures <br />