My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Property questions
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Place
>
3443 Crystal Place - 17-117-23-43-0005
>
Correspondence
>
Property questions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:41:22 PM
Creation date
6/8/2016 11:44:51 AM
Metadata
Fields
Template:
x Address Old
House Number
3443
Street Name
Crystal
Street Type
Place
Address
3443 Crystal Place
Document Type
Correspondence
PIN
1711723430005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cwilliams(c�3rhino.com <br /> P: 646-267-0083 <br /> ����������������� <br /> On Apr 3, 2013, at 2:14 PM, Christine Mattson <CMattson(cr�,ci.orono.mn.us> wrote: <br /> Craig, <br /> I had your email entered incorrectly the first time. <br /> Christine� <br /> From: Christine Mattson <br /> Sent: Wednesday, April 03, 2013 2:13 PM <br /> To: 'cwilliams@erhino.com'; 'fritrjongullickson370Ca�gmail.com' <br /> Cc: Lyle Oman; Melanie Curtis <br /> Subject: Hardcover/Landscaping questions regarding 3443 Crystal Place <br /> Craig, <br /> The property addressed 3443 Crystal Place is located in the LR-1 C zoning district and is in Tier 3 of the <br /> Stormwater Quality Overlay District which permits up to 35% hardcover. Attached is a copy of the survey <br /> dated July 26, 2012 showing the approved grading plan. The proposed home was constructed at 33.8% <br /> hardcover, see attached hardcover calculation sheet. <br /> A certificate of occupancy will not be issued until all exterior work, grading, landscaping, driveway, etc. are <br /> complete and approved. A temporary certificate of occupancy (TCO) can be issued; a TCO requires a $10,000 <br /> escrow which the City holds until all exterior work on the property is complete, an as-built survey and <br /> hardcover calculations have been submitted and approved by the City Engineer. <br /> Any landscaping changes or additions you propose must be approved by the City prior to commencement of <br /> the work via a Zoning Permit. Changes would also require an updated survey and hardcover calculations. <br /> Lyle Oman, Building Official, can answer your question regarding fire pit location and setbacks. Lyle can be <br /> reached at 952-249-4600. <br /> If you have any additional questions, please don't hesitate to contact me. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelly Parkway Orono MN 55356(physical address) <br /> PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ <br /> S 952.249.4620 g 952.249.4616 <br /> � cmattson@ci.orono.mn.us � www.ci.orono.mn.us <br /> Office Hours: Monday- Friday 8 am to 4:30 pm <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.