Laserfiche WebLink
WATER TlGHT e� LOCKABLE ELECTRIC BOX TREA�ED�PQS�T�4�x4 min) <br /> PLUGS OR E�ECTRlC CONNECTiONS /—ALI. E�ECTRIC CONNECTiONS MaDE <br /> 2" Pvc CONOUIT SCHEDULE 80 � (NSIDE 60X - <br /> MaNHa�E COVER CHAINEO & LOCKEO 6"SPACE 1.00P OF POWER CORD FOR <br /> � SETTLEMENT <br /> SEQLED MANHOLE RINGS FINAL GRAQE <br /> � <br /> - AT LEAST 12" � � <br /> ��� BELOW GRADE <br /> .,,� W 1 R E FRO M POW E R SUPP�LY <br /> ..; PIPE IS �AID ON A UNIFORM SLOPE FROM <br /> ��� �z�/d„S pUMP STATION UP TO SOIL TREATMENT AR�A <br /> �� . FOR PROPER ORAINBACK <br /> � SEALED TANK COVER �— IF PIPE AT TANK MUST BE LOWER THaN <br /> � UNION, TO GET ELEVATION FOR DRAINBACK, <br /> ; PLASTIC ROPE OR CHAIN A �/a INCH WEEP HOLE MUST BE USED <br /> � W ITH ANCHOR <br /> � L�LARM FLOAT ON SEPARATE WEEP HO�.E <br /> ( ELECTRICAL CIRCUIT <br /> ` NOTES� ELECTRICAL WIRE FROh1 POWER SUPP�� <br /> ; START �� � _ -�. _ MUST t�OT RUN OVER ANY TANKS BU' <br /> ' `'� MUST BE LAID BESIDE OTHER TANKS <br /> � �� — �8S CG;�ons �ec' 3"� `� AND NfUST 8E PLACED IN CONOUIT <br /> i <br /> Cy�/e sert G-+ �lCyc�Qs PQ� day ALONG POST <br /> SHUT- OFF LEVEL� _ _ _ ELECTRICAL. CORDS FROM PUMP AND <br /> FLOATS MUST BE RUN THROUGH <br /> PUMP CONTROL FLOAT CONDUfT, WIRES CANNOT HAVE GROUNC <br /> � CONTACT. <br /> � �� � <br /> � <br /> Fi Q ure F-8 <br />