Laserfiche WebLink
�, <br /> ��g�� <br /> �9�:� .. �� <br /> �� <br /> � �RC `;�'SEPTIC SYSTEI�I PERI`�IIT APPLICATION <br /> � CITY OF ORONO � � � :��.. <br /> Box 66 (2750 Kelley Parkway) . ��u <br /> Crystal Bay, I1�I�Y 5�323 ,� <br /> JOB SITE ADDRESS: / 7 S n v�;�l c ��'�' �% <br /> Occupancti• Type: Residential _(� Commercial Other <br /> Permit T�•pe: IV'etiv or Replacement Sy'stem, �100.00 G--�� <br /> Repair Existing System, $ �0.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , *See fee schedule for non-residential permit fees <br /> Owner's I�'ame: �i l.j C l-la�r� s PhoneNumber: ���f — ��{�Z� <br /> I�Iailing Address: City: �P� <br /> Contract�r's I�'ame: �ti�,��.�_ ,/ o Piionei\Tumber: �2�`-739� <br /> Nlailing Address: Z32c�c� (U�' ��i�i'-' City: J��exS' �� �S`��� <br /> DO tiTOT tiIA.II� PAI'�'IENT ��ITH THIS APPLICATIOti' <br /> GE\'�ERA-L I�TSTRUCTIO\TS <br /> 1, Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permics will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contrac[ors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi;n. Desijn <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the Ciry Inspector. <br /> 4, The follow�in� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverin�. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> after rouQh-up buc prior to sand placemenc (sand will be jar tested for silt content), <br /> and a�ain durin� pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal inspection to verify proper final cover depchs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5, Individual bolding MPCA Installer Certificate shall be present durin� inspections: A 2`�- <br /> hour notice is required for all inspections. <br />