My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
various correspondence re bldg permits. etc
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
175 Crystal Creek Road - 33-118-23-33-0006
>
Correspondence
>
various correspondence re bldg permits. etc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:04 PM
Creation date
6/7/2016 1:32:29 PM
Metadata
Fields
Template:
x Address Old
House Number
175
Street Name
Crystal Creek
Street Type
Road
Address
175 Crystal Creek Road
Document Type
Correspondence
PIN
3311823330006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , <br /> ;% � O \�� <br /> � � ��� <br /> �� � ��. <br /> �� �,: :,>;;,,. ������������� CITY of ORONO <br /> ,� � <br /> �, ti Mu���� otr�� <br /> °� Gti <br /> �' '� �� , �� ,�; <br /> .� ' � � „= Street Address: Mailing Address: <br /> �� �`9�fEggO�'i� 2750 Kelley Parkway P.O. Box 66 <br /> =_--�' Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> November 3, 2000 <br /> Richard Vogelgesing <br /> RVC Homes <br /> 913 Twelve Oaks Center <br /> 1>j00Wayzata Blvd. <br /> Wayzata MN 55391 <br /> Subject: New House Construction 175 Crystal Creek Road <br /> Dear Mr. Vogelgesing; <br /> RVC Homes is currently building a new house in the Crystal Creek Subdivision. Crystal Creek <br /> Road is a private road that is owned and maintained by the Crystal Creek Homeowners <br /> Association. The original bituminous curb that was installed by the subdivision developer was ' <br /> defective and was replaced in August. Shortly after installation, this new curb was damaged by <br /> construction vehicles associated with the new house construction. My understanding is that you <br /> are a���are of the need to correct this situation per previous conversations with Lyle Oman, City <br /> of Orono Building Official. A site inspection today indicates that the curb replacement has not <br /> . yet been completed. The curb along the entire lot frontage is damaged from construction vehicle <br /> traffic and needs to be replaced <br /> It is now too late in the construction season to install new bituminous curb and still have a high <br /> quality product. To ensure completion of the necessary curb replacement, next year during <br /> suitable ���eather conditions, the City of Orono is requesting that a financial guarantee be <br /> provided to the City before a"Certificate of Occupancy"' is issued far the house. This financial <br /> guarantee needs to be either a financial escrow or letter of credit for 150°% of the estimated curb <br /> replacement costs. This 150% financial guarantee is the amount that is used on all development <br /> projects in the City of Orono. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.