My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010912 - new septic
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
170 Crystal Creek Road - 33-118-23-33-0011
>
Septic
>
1998-010912 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:16 PM
Creation date
6/7/2016 1:08:26 PM
Metadata
Fields
Template:
x Address Old
House Number
170
Street Name
Crystal Creek
Street Type
Road
Address
170 Crystal Creek Road
Document Type
Septic
PIN
3311823330011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i�-17 <br /> ��p SELECTION PROCEDL�E <br /> EI�D PERFOqAT10N OF p pERFp{7ATF() L4TERAL <br /> A. Determine pump capacity: ,_�,,,,�,,,,, <br /> Gravity Distribution ��T�� -` <br /> 1. Minimum suggested is 600 gallons per hour(]0 gpm)to stay ahead of , � •, -� d��„w�k�� � <br /> water use rate. • ��°� •��-���_•�•a� <br /> .�,...a.e."�,.,, <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 . �+«���a��»a��_«�����+ <br /> - � Mro cov rwo. too <br /> gallons per hour(45 gpm)to prevent build-up of pmssure in drop box. ,•.,.R,„ -u�.,�, ,Z•,o E,a, <br /> IE o!Rxk Lqer <br /> Pressure Distibution �•P'"�«�u�id" <br /> cw.�saw inx <br /> 3.a. Select number of perforated laterals <br /> b. Select perforation spacing= feet ��••���� •,.�•�„� <br /> BNen PbtlnO Sand lnrr <br /> c. Subtract 2 R from the rock layer length. <br /> -2 ft.= feet <br /> d. Det rrrune the number of spaces between perforations. <br /> �Iigtti �PSf.Sp3C111g= ft.+ ft.= spaces Reyuued Perforahon Disch�'ge <br /> e. spaces+ 1 = perforations/lateral u�g�uons per a,u,�ee cgpn) <br /> f. Multiply perforations per lateral by number oE laterals to ����e , <br /> gettotalnumberofperforations. ,,�,�� x�_�= perforations. H�� �2m��'' �md�'' <br /> g- �r X��= gP�- <br /> 1.Oa 0.56 0.74 <br /> SELECTED PUMP CAPACTTY��7 gpn, 2.0�j Q.$� 1.04 <br /> B.Determine head requirements: a. Use for single family homes <br /> 1. Elevarion difference between pump and point of discharge. b.Use for all other applications <br /> �_feet <br /> 2. If pumping to a pressure distribudon system,five feet for pressure <br /> required at manifoid if gravity system,zero. <br /> .S feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. P�pe Lengch <br /> Read friction loss in feet per 100 feet from table. � Poinc of Discharge <br /> F.L._�f�/100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Elevauon Differencel <br /> point Add 25 percent to pipe length for fitting �P <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> x 1.25 = feet <br /> c. Calculate total friction loss b multi 1 n 1.5 inch 2.0 inch 3.0 inch <br /> Y P Yl g g� Pr�aim locs pc 100 fl ot pipc <br /> friction loss in ft/100 ft by equivalent pipe length. 10 0.69 0.20 <br /> Total friction loss= x +100= feet 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 128 0.38 <br /> speciai head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> (/ + �/� + �� 20 2_47 0.73 O.l 1 <br /> - 25 3.73 1.11 0.16 <br /> (1) (2? (3c) 30 5.23 1.55 0.2: <br /> 35 7_� 2.06 � 030 <br /> 40 11.07 264 0.39 <br /> TOTAL HFAD feet 45 14.73 3.2R 0.48 <br /> 50 3_99 � 0.5f <br /> C PUmp selection bo s.�� o.sz � <br /> I <br /> � 1. A pump must be selected to deli��er at least <br /> � �_gpm (Step A) �>ith at least �3 _ feet of total l�ead (St�>� 8}. <br /> 1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.