My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010912 - new septic
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
170 Crystal Creek Road - 33-118-23-33-0011
>
Septic
>
1998-010912 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:16 PM
Creation date
6/7/2016 1:08:26 PM
Metadata
Fields
Template:
x Address Old
House Number
170
Street Name
Crystal Creek
Street Type
Road
Address
170 Crystal Creek Road
Document Type
Septic
PIN
3311823330011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
������R� ����0,: <br /> r`�w . e'�'��' .. 4. ' : F: <br /> ' ' Westwood Professional Services, Inc .�;�� ,� ,,��' � ' � <br /> 104 Maity DiivP,Su�it�3 <br /> Buffalo,MN '�5313 <br /> Octobcr 13, 1998 <br /> Phone:61Z-682-2587 <br /> Fax 61Z-682-1fi39 <br /> Toil Ree: 1-888�682�2581 <br /> �I��at' HOIIIeS [mail wpsC�wes�woodps.com <br /> StCVe BOIII <br /> 740 E Lake Street <br /> Wayzata, MN <br /> RE: Septic System Site Plan For Lot 5, Blk. 3 Crystal Cre�k. <br /> Dear Steve: <br /> This proposed on-site septic system was designed for a 5 bedroom home, with an estimated flow of 750 <br /> gallons per day. Due to mottled soils at a depth of 24" in the primary site, the primary will need to be a <br /> mound system with 12"of sand under the rockbed at the upslope side. The site in which this system is <br /> proposed has a average existing ground slope of 5%, and percolation rates ranging from 19-30 MP1. The <br /> rock bed size wi(I be 10 feet wide and 63 feet long with the overall dimensions of the primary mound <br /> bci��g 84.0 feet long and 39S fect wide. <br /> An alternate septic system has been designed to sho��� that there is enough undisturbed area on the lot to <br /> support another septic system. This system was also designed for a 5 bedroom home. Mottled soils <br /> were found at a depth of 20 inches this would also require a mound system. The average slope of the <br /> area is 10% with percolation rates between 12 and 37 MI'1. Thc rock bed size will also be ]0 feet wide <br /> and 63 feet lon�. This mound will not need to be constructed unless the primary mound fails. <br /> Certain precautions will need to be made to protect the areas in which the above referenced septic <br /> systems are proposed. Both primary and alternate septic areas have been or will be staked off. It is <br /> critical that the soil is not disturbed before, during, and after construction of the system. <br /> These system should treat the septic effluent effectively if the system is installed properly and is <br /> maintained properly. It is recommenced that the septic tanks be pumped once every two years. This <br /> will reduce the chance of solids reaching the mound system. It is also recommended not to use <br /> excessive amounts of chlorine, soaps, and clllorine products which can kill bacteria in the septic tanks. <br /> This bacteria is needed to treat the septic efflueni. <br /> If you have any questions in regards to this design, t will be happy to answer them. 1 can be reachcd at <br /> (612) 682-2587. <br /> Sincercl�, <br /> WES I'W(�OU PROI�LSSIONAI_ SERVICLS, INC. <br /> �!�.� �� / % <br /> � /� <br /> 13crnic �lilicr , <br /> Scptic Site Dcsigncr <br /> MPCA Lic. No. 43 <br /> Desigrnnq�he Finure ioday since 1972 <br />
The URL can be used to link to this page
Your browser does not support the video tag.