My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-010945 - septic
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
135 Crystal Creek Road - 33-118-23-33-0004
>
Septic
>
1998-010945 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:56 PM
Creation date
6/6/2016 1:49:59 PM
Metadata
Fields
Template:
x Address Old
House Number
135
Street Name
Crystal Creek
Street Type
Road
Address
135 Crystal Creek Road
Document Type
Septic
PIN
3311823330004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/U2/9$ 13:59 F�� 6124975011 S P TESTING INC I�O: <br /> .7-P TESTING� ���. Steven B. Schirmers 8 Debra M_ Schirmers <br /> 951 ICatydid 1.,ene NE • St. Michaet, MN 55376 • (612) 497-3566 <br /> FAX(612)-497-5011 <br /> State License#394 <br /> October 31, 1998 <br /> Jyland Development <br /> Lot 3, 61ock 1 <br /> Crystal Creek <br /> Orono, Henn. Co., MN <br /> This on-site sewage treatment system ;s designed for a Type 1, five bedroom home, in <br /> atxorda�nCe wi#h the Minnesota PoHution Control Agency Chapter 7080 and local <br /> ordinances. <br /> 1"he soils on this site are typical of�+B - �eSueur loam - _ The seasonal�y saturated <br /> soils were loc,�ted at 18" to 38" (mottled Soil}. Due to the se�sonafly saturated soils, a <br /> Pressurized Mound System will need to be installed to treat septic effiuent. The bottom <br /> of the treatment area must be located at least 3' above the saturated soils. <br /> The soits at a depth of 18" have a per�olation rate averaging 11.fi mpi. <br /> A pumping chamber wili need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be la�ted outside the manhole a�d pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manif�otd and supply iine pipe must t�ave badc drainage to the pumping chamber. <br /> The distribution pipes shall have their ends Capped_ 8e sure the rock and sand fill <br /> material are clean_ The sod layer below the entire mounded ar�ea must be tumed over, <br /> just break up the sod, be sure not to over work_ <br /> A!I neighboring weils are located greater than 100' away from the proposed treatment <br /> area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.