My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
75 Crystal Creek Road - 33-118-23-33-0003
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:55 PM
Creation date
6/6/2016 12:08:27 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Crystal Creek
Street Type
Road
Address
75 Crystal Creek Road
Document Type
Septic
PIN
3311823330003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� O� <br /> O , O <br /> ���-� CITY of 4RON0 <br /> , � <br /> a <br /> ���,��� � <br /> �� ��`";;� ,�ti Municipal offices <br /> �����'�,,,�F�j���+�t'��G Street Address: Mailin�Address: <br /> �',F,+ggOg 2750 Keiley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> Owner: Ma�I� S��� 2(' S Address:_ � S �r yStal ��eek Rc� <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): ! <br /> O ��CODE SYSTEM�� ,�n ISTS which meets all the location,design and construction standards ofthe current Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM�� An ISTS which does not meet all the location,design and construction standards ofthe currerit Orono Municipal <br /> Code but does meet the three foot sepazation requiremertt,and which is not failing or an unmuierrt threat to public health or safety. <br /> 3 ��NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-yeac flood plain,any ISTS which may <br /> or may not meet all the locatioq design,or construction startduds of the cutrecrt Orono Municipal Code and which is failing for any reason;and <br /> any ISTS with less than three fret of unsaturated soil or sand between the distribulion device and the limiting soil characteristics. <br /> TAi�1K CONDITION(5-10): S <br /> Tank inspection indicates: <br /> � Pumpout not naeded at this time. <br /> 6 Tank must be pumped out this yeaz (city code requires tanks to be pumped out every 3 yeazs. Tank was last pumped ), <br /> 7 Solids accumulation in tanks is at a critical a crilical lecel. Tanks should be pumped out as soon as possible. <br /> g Systzm is discharging to thz sucface. Tatilcs must be pumped out within 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspeMed. Inspection risers(4"dia.pipe)must be installed in each tank at next pumpout Iftanks <br /> hace not bezn pumped out within the last three yeacs,they should be pumped out now. <br /> 10 Inspection pipe is located direcUy over tarilc ba$le(does not give accuratz measurement of solids accumulation). Iftanks have not been pumped <br /> out within the last ttuee years,they should be pumped out now. <br /> DRAINFIELD CONDITION 11-1-� : I I <br /> 11 Drainfield is dry,no surfacing evident <br /> I Z Some evidence of surfacing,not critical yet , <br /> 13 Drainfield is saturated and visibly dischazging untreated effluerrt to the surface. Corrtact the City Inspector immediatz(y.Repairs must be <br /> completed within 90 days. <br /> 1� Drainfield extent and condilion unknown. <br /> CONIl��ENTS: SySteM ( oo�S �}oo� . -r-rt�KS look l .ke ,j-1,e,, were fece�ti,� <br /> Avr-.pe <br /> (�—�,� —�1 ' 1'1'�� <br /> Date of Inspection Septic System Inspector ` <br /> Note: In the event that this inspection repoct is used to satisfy the requiremerrts for a mortgage or other transfer of property,be advised that this repoR does not guazantee <br /> or certify that an existing system wiil corrtinue to function properly,but is metely an opinion of the adequacy of the system under currerrt conditions based on the available <br /> information <br />
The URL can be used to link to this page
Your browser does not support the video tag.