Laserfiche WebLink
f Y ' � <br /> � � <br /> � <br /> � � CI <br /> � TY OF ORONO <br /> � � � � <br /> � SEPTIC S�S7�'EM APPROVAL <br /> o��� o <br /> �°`,�� � C ITY of O�O�T� <br /> � �`� � <br /> � ��� ����... �► <br /> c,�i�,-- � Municipal Otlices <br /> '�',�, �. �'v.���;�q ti, r�e on-�e s�x� <br /> �� � �� ��`��G c�y��aey,Minnesota 55323-OOG6 <br /> kESH�4 <br /> LOCATION: 60 Crystal Creek Rd. <br /> OWNER: <br /> GENERAL CONTRACTOR: Pillar xomes SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Westwood Professional �pORT DATE: April 30, 1999 <br /> The City of Orono has Approved your on-site system design as of May 10, 1999 <br /> (approved-disapproved) (date) <br /> with die following conunents: <br /> THIS IS NOT A PERMIT. Tl�is is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until tlie Inspections Department <br /> has verified that primary and al[ernate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, eic.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF N <br /> By �/% 1 <br /> Stephen kman, On-site Sy tems Manager <br /> TELEPIiONE—473-7357• FAX-473-0510 <br />