Laserfiche WebLink
�-��,-1�; <br /> ` � CTTY OF ORONO SEPTIC SYSTEM PERi`-IIT APPLICATION <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, hl�t �5323 <br /> ' �' � '� <br /> JOB STTE ADDRESS: ,� S CrZc/s/,� �. �'�yG K �C � <br /> Occupa.nc�• Type: Residential �/ Commercial Qther <br /> Permit Type: Netiv or Replacement Sy�stem, $100.00 L�� <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> , �`See fee schedule for non-residential permit fees <br /> Otivner's I�'ame: L l��aw �.�5 �l ��.%��,�� PhoneNumber: �7 — ���ju <br /> lYlailing Address: �' �-,l S ���•� C--� City: r`U,�•� ,��;,;,F�- 7ip:� <br /> Contractor's I�'ame: � �`�,�.,,�.o� �Sn� s Phonel�Tumber: �r? � - �3y3 <br /> Nlailing Address: ?3Zvv t �Y '� �'�"� City: t�oG-�s Z+p: S53�1 <br /> DO \TOT I�IAII� PAYI�IEi�'T ti�TTH THIS APPLICATIO�' <br /> GEYERAL TivSTRUCTIO\TS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the Ciry <br /> Offices; however, permits will not be mailed out. The permit must be picked up in <br /> person at the Ciry Offices and work must not be�in unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holdin� a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system desi�n. Desi?n <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval" cover sheet si�ned by the City Inspector. <br /> 4. The followin� inspections will be required for all septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to coverinJ. <br /> C. Drainfield trench installation prior to coverin�. For mounds, inspection is required <br /> after rouQh-up but prior to sand placement (sand will be jar tested for silt contenc), <br /> and a�ain during pressure distribution pipin� installation in the rock bed. <br /> D. Fi.nal i.nspection to verify proper final cover depchs and to verify that all pump station <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holdin�NIPCA Installer Certificate shall be present durin� inspections: A 24- <br /> hour notice is required for all inspections. <br />