Laserfiche WebLink
Figure #6 <br /> Sqft. <br /> Poured Concrete Foundation Area: 121 <br /> (Area Above Grade) <br /> Interior Air Film 0.68 <br /> Continuous Vapor Barrier 0.00 <br /> Foundation Wall 1.28 <br /> Insulation 10.00 <br /> Exterior Air Film 0.17 <br /> Total Assembly R-Value 12.13 <br /> Total Assembly U-Value (1/R) 0.082 <br /> Notes: <br /> 1 Only the above grade area of the foundation wall is to be included <br /> in the energy calculations. <br /> 2 The Energy Code requires that, if the floor above the basement or <br /> crawl space is not insulated, the foundation wall must be insulated. <br /> Either the foundation must have a minimum R-10 insulation applied <br /> from the top of the foundation to the frost line or a minimum R-5 <br /> insulation applied over the entire foundation wali. The R-Value <br /> specified is for the insulation material only. <br /> 3 If rigid foam insualtion is to be applied to the exterior of the foundation <br /> wall, the above grade portion must be protected from the sun, the <br /> weather and physical abuse. <br /> 4 If rigid foam insulation is to be applied tc <br /> protected by a minimum of 1/2"gypsum, board or equal (as specified <br /> in section 1712 of the Uniform Building Code). <br /> 5 Foundation wall insulatio for wood foundations must be installed as <br /> specified by the National Forest Products Association's Design <br /> Manual. <br />