My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-012267 - new septic
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Creek Road
>
20 Crystal Creek Road - 33-118-23-33-0007
>
Permits/Inspections
>
1999-012267 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:50:05 PM
Creation date
6/2/2016 12:10:03 PM
Metadata
Fields
Template:
x Address Old
House Number
20
Street Name
Crystal Creek
Street Type
Road
Address
20 Crystal Creek Road
Document Type
Permits/Inspections
PIN
3311823330007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y-+� `�-e <br /> � , , . <br /> S-�' �'J�►��'I1'0��, Il��'. <br /> 951 KATYDID LANE <br /> ST. MICF-IAEL, MN 55376 <br /> 497-3566 <br /> Steven �., S�hirmers <br /> October 5 , 1989 <br /> Al1an Carlson <br /> Lot 1 , Bloc.k Z <br /> Cr.y�tal Creek <br /> Orono, Henn . Co . , MN <br /> 'ZC' �(Ly s�r-r�c- �rLt�t-�K , <br /> This system is Designed for a Type 1, four bedroom home and in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances . <br /> The soils on this site are typical of SCS soils mapped - KkB - Kilkenny <br /> loam & LrC - Lester loam bordered by - Gc - Glencoe silty clay loam. A <br /> 14" , 20" , 26" , 30" , 32" , & 42" , (mottled soil ) . Due to the seasonally <br /> high water table , a pressurized mound system will need to be installed . <br /> The bottorn oi trie rock bed must be located at least 3 ' above the <br /> seasonally high water table . <br /> The soils at a depth of 18" have a percolation rate averaging 4 . 8 <br /> min/inch and are adequate for treating septic effluent. <br /> A pumping chamber will need to be installed to lift the effluent to the <br /> treatment area . <br /> The manifold and supply line pipe must have back drainage to the pumping <br /> chamber . The distribution pipes shall have their ends capped. Be sure <br /> the rock and sand fill mat�rial are clean. The sod layer below the <br /> entire mounded area must be turned over , just break up the sod, be sure <br /> not to over work. <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure . A warning device must be <br /> installed with a light and sound device, this is in case of a pump failure . <br /> (Mercury floats are a good method) . <br /> Al1 neighboring wells are located more than 100 ' away from the proposed <br /> treatment area . <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction as much as possible . The treatment area should be <br /> marked off before construction. <br /> CONT ' D <br /> Soil and Percolation 7'eata <br /> Septic System Deaign <br />
The URL can be used to link to this page
Your browser does not support the video tag.