Laserfiche WebLink
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,March 9,2009 <br /> 7:00 o'clock p.m. <br /> (PUBLIC COMMENTS, Continued) <br /> Gaffron stated that situation is located primarily in Minnetonka Beach, and at the time the City of Orono <br /> approved the five lots that are located in Orono, it was specifically spelled out that those ]ots could not <br /> have lake access. Gaffron indicated the City has owned these lots for a number of years. <br /> White stated he is willinQ to have the City look into this situation further and that perhaps Mr. Eiss would <br /> be entit]ed to a reduction in his taxes, which he should address with the assessor. White noted <br /> unfortunately this month a number of the counci] members will be absent and that he would recommend <br /> this situation be discussed in approximately a month. <br /> andy Gilbert, Long Lake Mayor, stated he is here to thank the City of Orono for its continua] <br /> c eration with Long Lake on many issues ran;ing from such things as the fire department an the <br /> poli department. <br /> Murphy s'Eated he did bring the issue of the Old Hi�hway 12 corridor up with Long Lake reviously, and <br /> that he is aware that there are continuing issues relatin�to the unsafe condition of the d Highway 12 <br /> corridor as it c cerns the potholes. A meeting was held on Thursday with Mn/DO representatives on <br /> an issue relating the Montesorri School and that the condition of old Highway _ was discussed at that <br /> time. Scott Peterso with Mn/DOT indicated they were looking at the situatio and that there might be a <br /> resolution by the end the year. Murphy stated he indicated to Mn/DOT t the sign issues as well as <br /> other issues has resulted ' the city officials being vilified by the business wners and that faster action <br /> should be taken to resolve ese issues. <br /> Gaffron stated it was his impres ' n that Mn/DOT was not in a h to resolve the issue. <br /> Murphy stated in his view the City sh ld draft a letter addr sed directly to the commissioner of <br /> Mn/DOT which lays out exactly the situ 'on and request at the situation be addressed in a prompt <br /> fashion. Murphy noted Old Hiahway ]2 is heduled t be turned over to the county in approximately six <br /> months but that some attention should be dire d o he situation given the unsafe nature of the potholes. <br /> McMillan concurred that a punch list/letter sho d b created and that photographs depicting the potholes <br /> be submitted alon�with the letter. <br /> Murphy moved,McMillan seconded.in conjunction with he City of Long Lake, compile a list of <br /> issues to be set forth in a joint lette�between the two cities ' ected to the Commissioner of <br /> Mn/DOT,pending formal appr�1 of the letter by the Long L e City Council. <br /> Gilbert noted Lon�Lake has meetinQ next week and they could addre it at that time. <br /> VOTE: Ayes 3, Nays 0 <br /> Gilbert commented,that Mn/DOT has taken away approximately 10 percent of Longl�,ake's tax base with <br /> the new U.S. HiQ way 12 corridor and that they have been left with a substandard road ing throu�h <br /> their town. <br /> McMillan oncurred the road should be repaired in the near future. <br /> PAGE 5 of 8 <br />